Original source · versioned page text
EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 1 EBFRMP 2023 Draft Final
Plans and drawings: the text below has words only, no drawings.
10.6. Minimise plastic elements in new and upgraded Environmental Immediate
coastal community infrastructure and management to Services Continuing
reduce plastic moving into the coastal environment Infrastructure
from community coastal infrastructure. Services
10.7. Incorporate relevant aspects of threatened Environmental Immediate
species, scheduled species and other significant Services Continuing
native species monitoring and management plans into
planning and management activities.
10.8. Investigate post event rapid response funding for Environmental Medium
ecological restoration. Services
10.9. Contribute to glory lily research and adopt best Environmental Medium
practise to managing this pest species. Services
Infrastructure
Services
10.10. Implement litter minimisation measures with Environmental Medium
other Council branches, better support community Services
litter collection efforts and collect coastal marine debris Infrastructure
information. Services
Waste Services
Measures
Measure Responsibility Timeframe
Conduct a desktop review of the extent of EBFR Environmental Every two years
vegetation and EBFR RE and HVR vegetation every Services
two years, using remote sensing data collected under
Climate Change
the Coastal Monitoring Plan. Vegetation % cover of
available land.
Monitor for any changes in the EBFRs RE mapping Environmental Every 5 years
every five years by measuring number of mapped REs Services
and high value regrowth, using desktop mapping,
vegetation management mapping and aerial photos.
Undertake BOA mapping in every 5 years. Compare Environmental Every 5 years
against management zone rehabilitation targets in Services
ecological rehabilitation plan, aiming for 75% or better
compliance.
Conduct a landscape ecology review of the EBFRs Environmental Establish
during the review of this plan, assessing patch size, Services baseline 2024-25
internal connectivity and landscape connectivity. Patch
Every 4 years
size, internal connectivity and landscape connectivity is
increased.
Eastern Beaches Foreshore Reserves Management Plan 2023 Page 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.