001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01 · OPW21/0134.02
PRIOR TO COMMENCEMENT OF WORKS
Tree Clearing/Retention
5. The Tree Survey/Civil Works Overlay plan from Appendix 6 of the approved Vegetation
Management Plan must be amended and submitted to Council for approval prior to the
prestart meeting with the amendments to include:
a. A colour coded legend included on the plan to be read in conjunction with the map; and
b. Corresponding colour coding included on the Tree Schedule table in Appendix 4 of the
approved Vegetation Management Plan.
6. Tree/vegetation protection fencing must be installed under the supervision of the Project
Arborist in accordance with the Vegetation Management Plan as prepared by Urban Forest
Concepts.
Engineering
7. Prior to the pre-start meeting, all necessary approvals from external service providers (e.g.
Unitywater, Energex, NBN) and external parties on which the development works are
proposed have been obtained and a copy supplied to Council.
8. A condition report including photographs of the frontage of the site and the section of Lake
Weyba Dr where the reconstruction works will tie into must be completed and submitted to
Council prior to the prestart meeting.
9. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
10. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Tree protection/clearing works;
c. Electrical reticulation works;
d. Erosion and sediment control works; and
e. Other relevant parties.
11. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
iii. Any proposed fencing to the site during the construction phase of the
development;
iv. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
Page 3 of 14
Document Set ID: 21885502
Version: 3, Version Date: 12/04/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 222 KB (small file)
- File type
No other editions are linked here.