001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01 · OPW21/0134.02
c. Within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to
mobilise sediment on site).
Damage to Services and Assets
44. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Vegetation Clearing/Retention
45. A qualified person* must be engaged for the duration of the works to:
a. Ensure works are carried out in accordance with the requirements of the approved
Vegetation Management Plan.
*(Refer to Advisory Note)
46. A QPWS recognised spotter-catcher must be engaged to manage fauna prior and during
clearing works in accordance with the requirements in the approved Vegetation Management
Plan and must:
a. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows;
b. Ensure clearing works avoids nesting times of animals and birds;
c. Co-ordinate staging and sequence of clearing with fauna protection;
d. Protect and recover fauna during clearing operations (not previously removed); and
e. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
Street Trees
47. Inclusion of 1 Callistemon viminalis (or similar species approved by Council) public amenity
tree* within the road reserve for every 8 metres of road frontage to Lake Weyba Drive. These
street trees are not to be included in replacement plantings as required by the Vegetation
Management Plan.
48. Public amenity trees* must:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Minimum 45L pot size.
c. Meet landscaping requirements detailed within Noosa Plan 2020 – PSP2 Landscaping.
d. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
e. Be located on the roadside side of the power lines.
f. Be located from services and infrastructure a minimum of:
i. 6m from electricity poles and pillars.
ii. 4m from street lighting.
iii. 2m from stormwater catchment pits.
iv. 2m from any adjoining driveway.
Page 8 of 14
Document Set ID: 21885502
Version: 3, Version Date: 12/04/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 222 KB (small file)
- File type
No other editions are linked here.