Council archive · source document
001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01 · OPW21/0134.02
g. Ensure mulch is placed around each tree, comprising of leaf and limb material of
varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment
contamination and is applied to all planting areas to ensure a minimum 100mm depth
once settled.
*(Refer to Advisory Note)
Weed Management
49. Weed control and management works must be undertaken in accordance with the approved
Vegetation Management Plan including the ongoing management of Singapore Daisy.
Bushfire Management
50. All works must be undertaken in accordance with the relevant requirements of the approved
Bushfire Management Plan.
FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
Certification
51. Upon completion of the work and prior to signing the plan of survey, the following
certifications must be provided to Council:
a. A certificate issued by an RPEQ certifying that the works have been constructed in
accordance with the Operational Works permit and the requirements of the Bushfire
Management Plan.
b. A certificate issued by the Project Arborist certifying that the works have been
undertaken in accordance with this approval and the requirements of the approved
Vegetation Management Plan.
As Constructed Plans and ADAC XML Files (Council)
52. Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
“As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
information shall include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
prepared in accordance with industry standards and recorded in “MGA - UTM56 /
GDA94” projection.
Please Note: Further information and advice relating to the as-constructed drawing
presentation, as-constructed survey capture and associated guidelines for preparation
of a compliant ADAC XML digital file are available on the webpage titled “As-
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.
c. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Licensed Surveyor in regard to the cadastral and locational information, levels
and applicable survey datum.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
Page 9 of 14
Document Set ID: 21885502
Version: 3, Version Date: 12/04/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 222 KB (small file)
- File type
No other editions are linked here.