Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Traffic Management Plan
1.26 Private Property
There are a number of private residences that will be directly affected by this scope of works:
1. 21 Wilgee Court
2. 166 Lake MacDonald Dr, Lake MacDonald QLD 4563
3. 156 Lake MacDonald Dr, Lake MacDonald QLD 4563
4. 152 Lake MacDonald Dr, Lake MacDonald QLD 4563
5. 171 166 Lake MacDonald Dr, Lake MacDonald QLD 4563
6. Houses 4-13 Pine Tree Drive W
Prior to construction commencing a letter box drop will be provided advising the residents of the upcoming
works.
1.27 Provisions for Special Events
NA
1.28 Specific Seasonal Activities
School holiday periods may increase traffic volumes
2. Project Description
2.1 Project Overview
The project includes the following:
▪ Clearing and grubbing to various locations
▪ Shoulder widening
▪ Construction of pavements and drainage
Due to the various work locations, all construction activity and deliveries will be contained and minimised to within
the immediate site boundary/area. Where works are to take place next to live traffic lanes, shoulder closures,
lane closures using temporary traffic signals and or controllers may be required.
2.2 Works Staging and Methodology
Works on Lake Macdonald Drive shall be completed in 1 mobilisation implementation of several TGS’ that
enable the construction of the 2 new access points to the development and also the shoulder widenings. Works
are planned to be completed in a sequential manner whilst maintaining continuity of work for work crews and
subcontractors. Similarly, Wilgee Court will be completed in a similar manner but with its own operation under
a separate set of TGS’.
Works will proceed with boundary demarcation followed by clearing of vegetation, earthworks and then
pavement construction.
The program for the works are currently anticipated as follows:
▪ Site Establishment - October 2020
IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 11 of 30