Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Traffic Management Plan
The traffic management for different areas will be organised under the NTOs direction by the Project Manager
responsible for that section of work and will involve the following:
▪ Familiar with the requirements of the TMP and TGS’s.
▪ Maintain an updated listing of personnel and subcontractors, both on and offsite who are suitably trained to
provide traffic management and emergency incident callout service.
▪ Maintain an updated listing of equipment available both on and offsite which would be available and
appropriate for traffic management and varying incidents.
▪ Develop and maintain a personal contact with emergency services representatives, Queensland Police
Service (QPS), DTMR and other relevant authorities if applicable.
▪ Liaise with the Administrator to ensure the relevant parties are continually updated as to the progress of the
work and any changes to either the TMP or the TGS’s.
▪ Be party to regular meetings with the management and construction staff for the purpose of obtaining
program forecasts and ensuring the requirements of the TMP will be implemented.
▪ Establish a program for suitable training of personnel in traffic management and emergency procedures, as
well as ensuring these issues are addressed at site inductions and toolbox meetings.
▪ Be responsible for the establishment and operation of the organisation charged with implementation of the
traffic management.
▪ Maintained a register of all incidents and complaints received, recording action taken to address each. A
similar register is to be maintained outlining requests for information from the public.
▪ Maintain a register of all devices used for traffic control, including the times and dates that they were erected
and dismantled.
▪ Coordinate all the reporting functions relating to traffic management.
▪ Be available to receive regular briefings on the implementation of the TMP, TGS’s and incident response
plans, attend inductions and toolbox meetings.
▪ Participate in the development of work procedures relating to traffic management and incident response
plans.
▪ Implement the work procedures in the field, in a manner that recognises the importance of safety of
employee, road users and members of the public in general.
▪ In conjunction with the Project Engineer ensure adequate resources are available and used to carry out
works in accordance with program and construction constraints.
▪ Ensure that all resources necessary to deal with traffic management and incident response issues, are on
hand or are readily available.
▪ Traffic controllers will be accredited traffic management implementers.
▪ Consultation of all traffic management operatives shall be sought at Pre-Start meetings for ideas for
improvements or safer implementation of the traffic management, an open and honest approach will be
maintained throughout the project to ensure all communication and consultation is recorded and discussed
for post traffic evaluation.
5.3 Out of Hours Representative
The name, address and contact details of three out of hours traffic management representatives will be supplied
to the Administrator during the construction period. The nominated persons will have the authority and
experience to organise immediate repairs, maintenance or replacement of the traffic control devices. The traffic
management representative will ensure that all repairs are carried out to the satisfaction of the Administrator
representative.
5.4 Principal Convened Traffic Coordination Committee
IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 16 of 30