Original source · versioned page text
Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTraffic Management Plan 3.3 Special Requests (Signage) Not applicable to this Project. 4. Haulage 4.1 Staff Parking Construction personnel may access the main site office off Lake Macdonald Drive. Car parking for for all vehicles, plant and equipment shall not park nor obstruct Lake Macdonald Drive. Subcontractors and other construction workers operating at the various locations on site will need to mitigate excess vehicles due to restricted working widths. With work site locations varying across the different areas of the project, private vehicles will be restricted access, car pooling will be encouraged, with only subcontractor vehicles permitted unless agreed otherwise. Workers will be made aware of particular areas where parking will be prohibited such as: ▪ Lake Macdonald Drive ▪ Outside of Traffic Management when operating on road shoulders ▪ Privat Land / Driveways ▪ Wilgee Court 4.2 Site Access and Egress The installation of an industry standard rumble grid will be located at the site entry to reduce the likelihood of excess gravel and soil being spread onto the nearby road network. The work site boundary will be established by fencing to maintain separation from the public where required. All long-term crossovers will be provided as per Council standards, while temporary crossover will be removed, and the kerb and verge being reinstated accordingly. 5. Human Resources 5.1 Training / Induction The competency needs of all personnel performing activities affecting traffic management and construction will be identified by the Supervisor in consultation with members of the project team. Personnel performing assigned tasks will be qualified on the basis of appropriate education, training, skills and experience, as required. Prior to work beginning onsite, all project personnel will undergo a site induction. This will cover the traffic management system and include requirements for safety, environment, site rules, administration and other issues relating to traffic management. Traffic Controllers will have an identification card showing that the person is a qualified Traffic Controller. The card will be issued by a training provider accredited by DTMR. The card will be carried by the Traffic Controller at all times whilst undertaking the duties of traffic control. 5.2 Nominated Traffic Officer The Nominated Traffic Officer (NTO) role will be fulfilled by: Andrew Hussey from Shadforth DTMR Traffic Management Design Card No. 651 Certification Type: Open IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 15 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.