Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                              Traffic Management Plan


3.3 Special Requests (Signage)

Not applicable to this Project.



4. Haulage
4.1 Staff Parking

Construction personnel may access the main site office off Lake Macdonald Drive. Car parking for for all
vehicles, plant and equipment shall not park nor obstruct Lake Macdonald Drive. Subcontractors and other
construction workers operating at the various locations on site will need to mitigate excess vehicles due to restricted
working widths. With work site locations varying across the different areas of the project, private vehicles will be
restricted access, car pooling will be encouraged, with only subcontractor vehicles permitted unless agreed
otherwise. Workers will be made aware of particular areas where parking will be prohibited such as:

▪    Lake Macdonald Drive
▪    Outside of Traffic Management when operating on road shoulders
▪    Privat Land / Driveways
▪    Wilgee Court

4.2 Site Access and Egress

The installation of an industry standard rumble grid will be located at the site entry to reduce the likelihood of
excess gravel and soil being spread onto the nearby road network. The work site boundary will be established
by fencing to maintain separation from the public where required.

All long-term crossovers will be provided as per Council standards, while temporary crossover will be removed,
and the kerb and verge being reinstated accordingly.


5. Human Resources
5.1 Training / Induction

The competency needs of all personnel performing activities affecting traffic management and construction will
be identified by the Supervisor in consultation with members of the project team. Personnel performing assigned
tasks will be qualified on the basis of appropriate education, training, skills and experience, as required.

Prior to work beginning onsite, all project personnel will undergo a site induction. This will cover the traffic
management system and include requirements for safety, environment, site rules, administration and other
issues relating to traffic management.

Traffic Controllers will have an identification card showing that the person is a qualified Traffic Controller. The
card will be issued by a training provider accredited by DTMR. The card will be carried by the Traffic Controller
at all times whilst undertaking the duties of traffic control.

5.2 Nominated Traffic Officer

The Nominated Traffic Officer (NTO) role will be fulfilled by:

Andrew Hussey from Shadforth

DTMR Traffic Management Design Card No. 651

Certification Type: Open




IMS-04-05_D - Reviewed May 2019                  Document Uncontrolled When Printed                         Page 15 of 30
Log in to download the original file

Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.