Traffic Management Plan_IMS-04-05_D (001) FOR APPROVAL
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Traffic Management Plan
▪ Department of Transport and Main Roads “Manual of Uniform Traffic Control Devices” (MUTCD):
o Part 3: Works on Roads ( July 2019)
o MUTCD Supplementary Notes to Part 3
▪ TOD Engineers & project Managers Project Specific Specification
▪ Traffic Management for Construction or Maintenance Work COP 2008
▪ Workplace Health & Safety Act 2011
▪ Workplace Health & Safety COP Notice 2011
▪ Workplace Health & Safety Regulations 2011
▪ Traffic Management Construction COP 2008
▪ Traffic Controller Accreditation Scheme Approved Procedure (December 2017)
▪ Transport and Main Roads Specifications: MRTS02, MRTS02.1
1.4 Objective of this Plan
This TMP summarises the overall traffic management strategy and traffic safety requirements, associated with
the earthworks, shoulder widening, vehicular access/egress and Construction Stages. The overarching aim,
being to ensure a coordinated approach to traffic management and the successful delivery of the program of
works, whilst minimising disruption to road users and the surrounding community.
The TMP provides an overview of measures to manage and control movement during the works. It sets out the
responsibilities for the safe and orderly passage of vehicular and pedestrian traffic around the site at all times
from the commencement of work on site. This TMP shall be updated and approved as required.
It outlines the commitment, responsibility and strategy to be adopted to ensure compliance with the traffic
management and traffic safety requirements of the ‘Transport and Main Roads Standard Specification –
Provision for Traffic’ (MRS02) and the MUTCD Part 3 Work on Roads. This plan seeks to ensure the certainty
of delivery of the prescribed traffic management and control devices and to minimise any disruptions to traffic.
1.5 Key Personnel and Out of Hours Contact Details
Name Position Company Phone Email
James Harris Project Manager Shadforth 0417 736 105 [email protected]
Andrew
Traffic Officer Shadforth 0450 607 330 [email protected]
Hussey
Mark
Community Liaison Shadforth 0400 524 763 [email protected]
Lonergan
Mark Health and Safety
Shadforth 0400 524 763 [email protected]
Lonergan Manager
Darryl Hart Site Supervisor Shadforth 0407 395 496 [email protected]
Police Police Emergency 000
1.6 Limitations of this Traffic Management Plan
IMS-04-05_D - Reviewed May 2019 Document Uncontrolled When Printed Page 5 of 30