PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 OCTOBER 2020
The building does not meet the energy efficiency requirements for the National
Construction Code Internal room sizes do not suit the equipment or functional requirement
of an imaging and medical centre
Inability to add lead lining to existing walls required for x-ray equipment due to additional
weight impact on existing inadequate structure
Inability to install, service or replace imaging equipment due to existing roof framing
Electrical system is inadequate for proposed use
Plumbing and drainage system is inadequate and unsuitable
A range of WHS issues that would require modification to the existing building
Suspicion of existing lead paint beneath external (an internal) finishes which would be
required to be completely removed or encapsulated which would substantially change the
appearance of the building
None of the interior or exterior walls would achieve the required acoustic ratings for
imaging and medical centre
Commercial grade specialist solution mechanical system is required for medical and
imaging fit outs which could not be accommodated within the existing building fabric
The applicant provided a further report from Bligh Tanner dated 21 July 2020 which provided a
structural assessment of the existing house for adaptive re-use as a medical centre. This report
identified the following upgrade works as being required:
The complete dwelling should be raised and temporarily supported while the existing
stumps and block walls are removed, after which new footings, stumps and perimeter block
walls should be installed. The floor will require re-levelling.
All floor framing members would need to be strengthened for the increased live loading
allowance (e.g. allow for splicing existing timber bearers and joists with members to match
existing size to increase the capacity). - All floorboards would need to be removed and
replaced to allow for the increased live load allowance.
Majority of internal walls would need to be demolished and temporary propping of existing
roof structure and external walls required. Transfer beams, roof support framing and
internal walls would all need to be designed to suit proposed medical centre floor layout.
External wall cladding would require removal and replacement for installation of acoustic
treatment and thermal insulation and installation of bracing wall elements.
Remove and replace external walls with walls achieving required FRL where walls are
within 3m of fire source feature (e.g property boundary).
Upgrade roof framing to strengthen where required and upgrade to current codes and
building practices. Allow for strengthening of roof framing to specialist equipment areas
where support from roof structure is required (CT scanner, X-ray gantry).
Remove and replace external cladding due to widespread visible damage, paint flaking,
discolouration and rust stains around nail heads.
Modifications to front entry to comply with provisions for universal access (e.g. installation
of ramps or lift access).
These documents were referred to Council’s Building Certifier and to Council’s Heritage
Coordinator for review and comment. The comments note that it is commonplace for existing
buildings to be altered, particularly where involving changes of classification, whereby the
existing building is modified to achieve compliance with relevant legislation. In this regard the
comments noted the following:
Page 25 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.