Unclear as to why it would not be possible to alter the existing building to achieve compliant
access for persons with disabilities. The current proposal identifies an access ramp at the
front of the building. It appears the proposed building is intended to have a floor level at or
above the floor level of the existing building. This seems to identify that the provision of
compliant access is achievable, and it would appear then to be a design exercise to
incorporate the new construction into the character of the existing building.
Restumping of existing buildings is undertaken regularly and would not usually be
considered a difficult task.
It stands to reason that the existing building may not be suitable for additional loading
brought about by the change in classification. However, this again would simply be a
design/engineering exercise to upgrade the existing building to suit.
If it were not possible for the building to be modified to suit the additional loading
associated with the imaging/x-ray equipment it is noted that the imaging/x-ray component is
a small part of the overall development footprint. In this regard, the existing building could
be repurposed for a suitable use such as reception/office/storage/consulting rooms.
It would be standard practice to install mechanical ventilation system components within
the roof space. Traditionally, older buildings have a reasonable roof pitch which can easily
cater for ductwork. In the instance the existing building has a raked ceiling, and there may
be options to install false ceilings to conceal services.
Structural upgrading can be undertaken to suit the intended use.
It is not unusual for internal modifications to be undertaken.
The existing building envelope would need to be considered for the purposes of energy
efficiency. Given the extent of the proposed development, upgrading of the existing
building is unlikely to be cost prohibitive.
For this type of development, the replacement of existing electrical systems and
plumbing/drainage would be commonplace. It could be assumed that the same
installations would be applicable to the new build. There may be minor cost increase due
to working with the existing building.
Whilst some works would be required to address the risk attributed to lead paint the
presence of lead paint would not preclude the use of the building for alternate purposes.
It is not uncommon for Queenslanders to be adaptively re-used for alternate purposes and
WHS requirements complied with.
Whilst a person’s financial circumstances cannot form part of the assessment of an application, it
is noted that it is difficult to provide comment on building cost comparison due to the limited
information available. It would be usual to expect additional costs when modifying an existing
building, however, given the relatively small nature of the existing building in comparison to the
overall development, it is anticipated that there would not be a significant variation.
It is also noted that the applicant’s list of required works appear to apply a worst case scenario
and there also appears to be recommendations within the 21 July 2020 report which conflict with
the findings of the Structural Engineering Report dated 24 February 2020. For example with
regards to the cladding the 24 February 2020 report states:
The chamferboard appeared to be in relatively sound condition given its age. There was
typically no evidence of insect damage or rot at key locations where such damage would
normally be evident (e.g. at window edges and building corners likely exposed to pooling
water). There was widespread minor defects to the chamferboards including visible
damage, paint flaking, discolouration and rust stains around nail heads.
This is in conflict with the 21 July 2020 Report which states:
Page 26 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.