Original source · versioned page text
Diamond St Minor Change - App A SARA Approved Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2. In accordance with section 70 of the TIA, the applicant for the planning application is bound by
this decision. A copy of section 70 is attached as Attachment B, as required, for information.
Further information about the decision
1. In accordance with section 67(7) of TIA, this decision notice:
a) starts to have effect when the development approval has effect; and
b) stops having effect if the development approval lapses or is cancelled; and
c) replaces any earlier decision made under section 62(1) in relation to the land.
2. In accordance with section 485 of the TIA and section 31 of the Transport Planning and
Coordination Act 1994 (TPCA), a person whose interests are affected by this decision may apply
for a review of this decision only within 28 days after notice of the decision was given under the
TIA. A copy of the review provisions under TIA and TPCA are attached in Attachment C for
information.
3. In accordance with section 485B of the TIA and section 35 of TPCA a person may appeal
against a reviewed decision. The person must have applied to have the decision reviewed
before an appeal about the decision can be lodged in the Planning and Environment Court. A
copy of the Appeal Provisions under TIA and TPCA is attached in Attachment C for information.
Further approvals
The Department of Transport and Main Roads also provides the following information in relation to
this approval:
1. RoadAc c essWor ksAppr ov alRequi r
ed–Wr i
ttenappr ov alisr equi
redf r
om t hedepar tmentt o
carry out road works that are road access works (including driveways) on a state-controlled road
in accordance with section 33 of the TIA. This approval must be obtained prior to commencing
any works on the state-controlled road. The approval process may require the approval of
engineering designs of the proposed works, certified by a Registered Professional Engineer of
Queensland (RPEQ). Please contact the department to make an application.
If further information about this approval or any other related query is required, the North Coast
District, Development Assessment Team, should be contacted by email at
[email protected] or on (07) 5451 7055.
Yours sincerely
Chris Head
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.