Original source · versioned page text
Appendix 4 - Planning Scheme Code Responses
Performance Outcomes Acceptable Outcomes
(k) discourages crime or antisocial behaviour
by facilitating casual surveillance of
streets, paths and public open space;
(l) avoids the sporadic or out-of- sequence
creation of lots; and
(m) protects and enhances ecologically
important areas and provides for the
clustering of lots into cleared areas.
Infrastructure N/A – no additional lots created – boundary
PO10 No acceptable outcome provided realignment only
Development accommodates and provides for
the efficient and timely delivery of infrastructure
appropriate to the site’s setting and intended
use.
PO11 N/A – no additional lots created – boundary
Roadway and pathway layout are No acceptable outcome provided realignment only
predominantly rectilinear with a high degree of
permeability.
Editor’s Note— Further detail on traffic and the
road network is addressed in Part 9.4.8 Transport
Code
Infrastructure and services Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Infrastructure and services
PO12 AO12.1 N/A – no additional lots created – boundary
New lots are located, sized and configured so as All lots are connected to power supply and realignment only
Appendix 4 – Planning Scheme Code Responses
Reconfiguring of a Lot – Boundary Realignment (2 Lots into 2 Lots)
51 Hamersley Lane, Lake Macdonald – Lot 5 RP203483
81 Hamersley Lane, Lake Macdonald – Lot 6 RP203483
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.