Original source · versioned page text
Appendix 4 - Planning Scheme Code Responses
Performance Outcomes Acceptable Outcomes
to ensure each lot is capable of being serviced telecommunications services and where located
by appropriate levels of infrastructure including: within the Urban boundaries, power supply and
communications infrastructure are provided
(a) power supply; underground.
(b) telecommunications; and
(c) where within Local Plan Areas AO12.2
(d) reticulated water supply; If located in a water service area each new lot
(e) reticulated sewerage; and can be connected to Unitywater’s water supply
(f) stormwater drainage. network.
AO12.3
If located in a sewerage service area each new
lot can be connected to Unitywater’s sewerage
network.
AO12.4
If located in a Local plan area lots can be
connected to Council’s stormwater drainage
network.
AO12.5
If not in a sewerage service area each lot has
sufficient area and other attributes to ensure
efficient and effective on-site sewerage disposal.
PO13 AO13.1 N/A – no additional lots created – boundary
Each lot is provided with safe and convenient Vehicular access for the development is realignment only
vehicle access consistent with the function and design of the road
it takes access from.
AO13.2
Development does not require new or
changed access to a state-controlled road that is
a limited access road unless in accordance with
the limited access policy for the state-controlled
Appendix 4 – Planning Scheme Code Responses
Reconfiguring of a Lot – Boundary Realignment (2 Lots into 2 Lots)
51 Hamersley Lane, Lake Macdonald – Lot 5 RP203483
81 Hamersley Lane, Lake Macdonald – Lot 6 RP203483
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.