ORDINARY MEETING AGENDA 18 AUGUST 2022
Approved Plans – July 2022 Units 9-10 (Lot 30 SP307674)
Plan No. Plan, prepared by Date
SK 002 Proposed Holyman Unit 3D perspectives, prepared by N/D
Iss SK2 Gerard Smith Design
SK 101 Site Plan, prepared by Gerard Smith Design May 2022
Iss SK2
SK 102 Setback Plan & Vehicle Manoeuvring Plan, prepared by May 2022
Iss SK2 Gerard Smith Design
SK 201 Floor Plan – All Levels, prepared by Gerard Smith Design May 2022
Iss SK2
SK 401 Elevations – Sheet 1, prepared by Gerard Smith Design May 2022
Iss SK2
SK 501 Cross Sections – Sheet 1, prepared by Gerard Smith May 2022
Iss SK2 Design
SK 951 Overviewing Diagrams – Level 1, prepared by Gerard May 2022
Iss SK2 Smith Design
SK 952 Overviewing Diagrams – Level 2, prepared by Gerard May 2022
Iss SK2 Smith Design
3 Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council prior
to obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site
for pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with
the proposed construction works that need to be onsite or in proximity to the
site at any time during the phases of the construction works. Where relevant,
time slots and off-peak hours should be indicated. All efforts must be made
to prevent or minimise adverse impact on public parking availability in the
local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the
final Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
Page 10 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.