2022-08-18 Ordinary Meeting Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                            18 AUGUST 2022


                         Approved Plans – July 2022 Units 9-10 (Lot 30 SP307674)
        Plan No.         Plan, prepared by                                           Date
        SK 002           Proposed Holyman Unit 3D perspectives, prepared by N/D
        Iss SK2          Gerard Smith Design

        SK 101           Site Plan, prepared by Gerard Smith Design                  May 2022
        Iss SK2
        SK 102           Setback Plan & Vehicle Manoeuvring Plan, prepared by May 2022
        Iss SK2          Gerard Smith Design

        SK 201           Floor Plan – All Levels, prepared by Gerard Smith Design May 2022
        Iss SK2
        SK 401           Elevations – Sheet 1, prepared by Gerard Smith Design       May 2022
        Iss SK2
        SK 501           Cross Sections – Sheet 1, prepared by Gerard Smith May 2022
        Iss SK2          Design

        SK 951           Overviewing Diagrams – Level 1, prepared by Gerard May 2022
        Iss SK2          Smith Design

        SK 952           Overviewing Diagrams – Level 2, prepared by Gerard May 2022
        Iss SK2          Smith Design

    3     Development authorised by this approval must be undertaken generally in accordance
          with the Approved Plans listed within this Decision Notice.
          Construction Management Plan & Pre-Start Meeting
    4     A Construction Management Plan must be submitted to and approved by Council prior
          to obtaining a building approval and must specifically address the following:
          a.       Traffic Management during all aspects of the construct phase including.
                   i.    Traffic Management Control Plan in accordance with Manual of Uniform
                         Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                         control measures prior to construction.
                   ii.   Maintenance of safe and unobstructed access across the frontage of the site
                         for pedestrians and vehicles both during daily construction and after daily
                         construction has ceased.
                  iii.   Parking arrangements, number, and locations for vehicles associated with
                         the proposed construction works that need to be onsite or in proximity to the
                         site at any time during the phases of the construction works. Where relevant,
                         time slots and off-peak hours should be indicated. All efforts must be made
                         to prevent or minimise adverse impact on public parking availability in the
                         local area.
          b.       Works programme identifying key components of the works and their respective
                   durations.
          c.       Written confirmation from the Body Cooperate accepting the use of the common
                   property for activities associated with the construction works as identified in the
                   final Construction Management Plan and the Traffic Management Plan.
          d.       Proposed fencing to the site during the construction phase of the development.

                                                                                       Page 10 of 55
Log in to download the original file

2022-08-18 Ordinary Meeting Agenda(PDF, 4MB).pdf · 4.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.