ORDINARY MEETING AGENDA 18 AUGUST 2022
e. Protection fencing for existing landscaping and trees in proximity to the work
activities.
f. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures to prevent silt and contaminants from entering existing
stormwater system.
g. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed construction
times, impacts on traffic and services and other relevant issues.
h. identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
5 Council must be contacted at least 5 working days prior to any works commencing to
organise a pre-start meeting. The contact number to arrange a pre-start meeting is
Development Construction Officer on ph.5329 6465. The pre-start meeting must include:
a. The relevant parties for any Civil Engineering and Building works.
b. A representative of the Body Corporate.
The applicant must provide copies of the approved construction and traffic
management plans for the attendees at the prestart meeting.
Frontage Condition Report
6 A condition report including photographs of the frontage of the site must be completed
and submitted to council at the prestart meeting and prior to any works commencing.
General Requirements
7 Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
8 The developer must meet any costs to repair damage to any Council asset during
construction where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must be
repaired immediately on completion of the works associated with the development.
Performance Bond
9 Deleted.
Performance Bond
10 Security in the form of a cash bond or trading bank guarantee to the sum of $4000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Building Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves
the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Building Appearance
11 All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible externally from adjoining land uses.
Privacy – Unit 17
Page 11 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.