2016-12-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
Cleanaway are the incumbent contractor and have a good performance track record in Noosa
which means the transition from the current contract to the new contract should be relatively
seamless.
Cleanaway have experience in the Noosa garden waste collection service and will be able to
smoothly transition to the 3 bin service without significant impact on the community or
businesses.
Cleanaway have agreed to include limited food waste in the garden waste bin without
increasing their tendered price.
The Cleanaway tender offers other innovations identified elsewhere in this report.
Financial Evaluation by AEC Group Ltd
The scores and pricing summaries were then forwarded to AEC Group Ltd to review any trends
in the rise and fall formula or shire growth which would influence the proposal to engage
Cleanaway as the preferred tenderer. A copy of the summary by AEC is attached to this report as
Attachment 3. The information provided indicates that there is no anticipated influence over the
term of the contract that would change the recommendation for awarding the contract as
proposed in this report.
Zero Emission Initiatives
Waste vehicles consume a significant amount of diesel in the performance of the waste collection
service. Given Councils pursuit of Zero Emissions a significant effort was given to reducing the
impact of diesel consumption within the waste collection fleet. The following potential alternative
sources of powering the waste collection vehicles and the outcomes of the investigation are
detailed below.
Electric Power – The weight of the vehicles plus payload, terrain and requirement to
recharge the batteries means this is not currently a solution for waste collection vehicles. It is
only viable for smaller vehicles with short travel distances.
Biodiesel B20 – is a potential fuel source that is available and can be used in the collection
fleet. During tender negotiations the use of B20 was discussed with two tenderers shortlisted
for negotiations. Waste collection vehicles operate under full acceleration and deceleration
and have significantly different operational patterns of wear and tear to other vehicles used
for long haulage on highways.
Manufacturers are not prepared to warrant the motors in the collection vehicles proposed to
be used in the Noosa contract if they use B20.
The frequency of maintenance of the vehicles is shortened and costs are increased.
Diesel consumption per 100km is increased by 3%.
There may be a slight but not significant loss of power using this fuel.
The quality of B20 can fluctuate significantly from current suppliers and can result in damage
to engines.
The waste fleet performs an essential service and potential breaks in continuity of service
were seen as a significant risk by all contractors during negotiations.
None of the tenderers were openly prepared to risk using B20.
Biodiesel B100 – similar comments relate to B100 as for B20. However, there is a greater
risk of using B100 as trucks cannot revert back to diesel without a complete retrofitting of
engine seals and filters etc. Contractors were not prepared to risk losing the warranty on
engines used in the collection fleet by using this fuel.
Page 50 of 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.