Original source · versioned page text
2016-12-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
Street Identification
11. The street address of the development must be clearly visible and discernible from
the primary frontage of the site by the provision of a street number and, where
appropriate, the developments name.
ENGINEERING
Site Access and Driveways
12. Sealed access driveways must be provided from McKinnon Drive to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with the Department of Infrastructure, Local Government and Planning
response reference number SDA-0816-032888 dated 7 November 2016 and
generally in accordance with Council’s standard drawing RS-056.
13. Approval from the Department of Transport and Main Roads for the final design of the
site access and driveway works must be submitted in writing to Council prior to the
issue of any Development Permit for Operational Works.
Car Parking
14. A minimum of 21 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. service vehicle parking, manoeuvring and standing spaces
b. dimensions, crossfalls and gradients in accordance with Australian Standards
AS/NZS2890.1:2004, AS/NZS2890.6:2009 and AS2890.2:2002.
15. The carparking area must be constructed with either a sealed surface or other bound
material that is suitable for the intended use. Certification of the proposed surfacing
from an RPEQ must be submitted as part of the operational works application.
16. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
17. Directional signage must be provided to direct visitors and guests to the car parking
spaces provided on site.
Traffic Management
18. A traffic management plan for both the regular operation of the development and any
special events must be submitted as part of the Operational Works application. The
traffic management plan must include but not be limited to:
a. day to day parking of the various vehicle types
b. parking for larger vehicles (buses, deliveries, waste collection etc)
c. overflow parking for special events
d. temporary traffic control measures on McKinnon Drive
e. endorsement by the Department of Transport and Main Roads.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. collection of runoff from the buildings and hardstand areas
Page 9 of 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.