Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2016-12-12 General Committee Agenda

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                           12 DECEMBER 2016


         b.    collection of runoff from the carparking areas and access aisles
         c.    certification from an RPEQ that states the development of the site will not
               create a worsening for downstream properties in regard to stormwater quality or
               quantity.
         Earthworks and Retaining Walls
   20.   All fill and associated batters must be contained entirely within the subject site unless
         written permission from the respective landowner(s) is provided to Council.
         Damage to Services and Assets
   21.   Any damage caused to existing services and assets as a result of the development
         works must be repaired at no cost to the asset owner at the following times:
         a.    where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
         b.    where otherwise, upon completion of the works associated with the
               development.
         Any repair work which proposes to alter the alignment or level of existing services
         and assets must first be referred to the relevant service authority for approval.
         Noise
   22.   Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
         compressors, pumps etc on site should be situated within the building or suitably
         provided with noise reduction measures and located as to prevent a noise nuisance
         beyond the boundary of the site and not exceed the levels specified in Table 1.
          TABLE 1

                    NOISE LIMITS AT A SENSITIVE RECEPTOR

                             Noise level at noise sensitive place measured as the adjusted
              PERIOD
                             maximum sound pressure level (L10, adj,T)

              7am – 6pm          Background noise level (L90,T) plus 5 dB(A)

              6pm – 10pm         Background noise level plus 5 dB(A)

              10pm – 7am     Background noise level plus 3 dB(A)

                    NOISE LIMITS AT A COMMERCIAL PLACE

                             Noise level at a commercial place measured as the adjusted
              PERIOD
                             maximum sound pressure level (L10, adj,T)

              7am – 6pm          Background noise level (L90,T) plus 10 dB(A)

              6pm – 10pm         Background noise level plus10 dB(A)

              10pm – 7am         Background noise level plus 8 dB(A)




                                                                                   Page 10 of 81
Log in to download the original file

2016-12-12 General Committee Agenda(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.