Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Project types
Noosa has a network of 240kms of sealed paths and 153kms of cycle routes, however, to create a connected and safe network
more infrastructure is required. A total of 453 infrastructure projects have been recommended for implementation. Of these, 173
involve upgrades to existing facilities (approximately 99km) with the other 280 being new facility projects (approximately 208km).
Figure 12 summarises the 453 projects into their project types.




                                                                T
                                          AF
 Figure 12: Infrastructure type                                                Figure 13: Number of projects by network type


Prioritisation
A set of scoring criteria were developed in consultation with the PRG to prioritise the 453 projects. The projects were individually
                                  R

scored against each of the criteria, with the total score for all criteria used to determine its priority. The scoring criteria and
associated weightings are provided in Figure 14.
                    D




 Figure 13: Assessment criteria


                                                                                                                                       37
Log in to download the original file

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan(PDF, 27MB).pdf · 28.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.