Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Implementing the strategy
 Based on the project prioritisation criteria of “Getting more       Available funding estimates
 people riding a bike or walking” and “achieving value for
 money”, most of the projects which scored highly in the             The available funding for bike riding and walking projects
 prioritisation process were located in the coastal areas            was estimated as $1.45 million per annum (pa) over the next
 where population densities are higher and there are more            10 years. This total equates to what has been forecast by
 destinations such as centres, schools, sport and recreation         Council in the 2023 to 2030 annual expenditure on pathway
 facilities and activity centres. This outcome is reflected in the   and boardwalk upgrades and expansions.
 proposed 5 and 10-year implementation plans.
                                                                     There may be opportunities to seek additional funding
 In addition to the projects selected through the prioritisation     from various sources to complete future projects in the
 process, the PRG saw the opportunity to deliver low cost,           implementation plan sooner. For example, Noosa Council
 high impact infrastructure, such as temporary bike lanes and        has been successful in attracting Cycle Network Local
 short length missing link projects to achieve our vision. A         Government Grants from the State Government in the past.
 funding stream dedicated to the delivery of low cost/missing
 link projects (under $100k) throughout the Shire has been
 included in the proposed 5 and 10 year implementation plans
                                                                     T
                                                                     Such funds would supplement the $1.45 million pa assumed
                                                                     to be available and allow for future projects to be delivered
                                                                     sooner. It's Council’s intention to prioritise the delivery of
                                              AF
 at a value of $250k per year. A total of 22 low cost projects       active transport projects when it considers the annual budget.
 have been identified as local and hinterland links.                 This will include investigation into alternative funding streams.

 In line with objective 8, deliver value for money outcomes,
 Council will strive to reduce the cost of walking and bike riding
 infrastructure projects by further investigating cost- effective
 options during design.
                                 R

 By implementing cost effective projects, such as pop up bike
 lanes, Noosa will see the vision for more people walking and
                    D


 riding a bike realised more quickly.




38
Log in to download the original file

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan(PDF, 27MB).pdf · 28.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.