Original source · versioned page text
2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan
The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Implementing the strategy
Based on the project prioritisation criteria of “Getting more Available funding estimates
people riding a bike or walking” and “achieving value for
money”, most of the projects which scored highly in the The available funding for bike riding and walking projects
prioritisation process were located in the coastal areas was estimated as $1.45 million per annum (pa) over the next
where population densities are higher and there are more 10 years. This total equates to what has been forecast by
destinations such as centres, schools, sport and recreation Council in the 2023 to 2030 annual expenditure on pathway
facilities and activity centres. This outcome is reflected in the and boardwalk upgrades and expansions.
proposed 5 and 10-year implementation plans.
There may be opportunities to seek additional funding
In addition to the projects selected through the prioritisation from various sources to complete future projects in the
process, the PRG saw the opportunity to deliver low cost, implementation plan sooner. For example, Noosa Council
high impact infrastructure, such as temporary bike lanes and has been successful in attracting Cycle Network Local
short length missing link projects to achieve our vision. A Government Grants from the State Government in the past.
funding stream dedicated to the delivery of low cost/missing
link projects (under $100k) throughout the Shire has been
included in the proposed 5 and 10 year implementation plans
T
Such funds would supplement the $1.45 million pa assumed
to be available and allow for future projects to be delivered
sooner. It's Council’s intention to prioritise the delivery of
AF
at a value of $250k per year. A total of 22 low cost projects active transport projects when it considers the annual budget.
have been identified as local and hinterland links. This will include investigation into alternative funding streams.
In line with objective 8, deliver value for money outcomes,
Council will strive to reduce the cost of walking and bike riding
infrastructure projects by further investigating cost- effective
options during design.
R
By implementing cost effective projects, such as pop up bike
lanes, Noosa will see the vision for more people walking and
D
riding a bike realised more quickly.
38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.