2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5-year implementation plan

Table 14 lists the projects in the 5-year implementation
plan. A total of 29 projects including 19 low cost/missing link
projects have been identified. The estimated cost of these
projects totals $14.6 million and includes grant funding.

The Garth Prowd Bridge and Noosa Parade projects will
provide a high-standard bike riding and walking connection
between Noosaville and Noosa Heads, two of Noosa’s
largest and busiest centres. These connections are
expected to be a key catalyst for the growth of bike riding
and walking.

10-year implementation plan

Table 15 lists the projects in the 10-year implementation
plan. A total of 12 projects including 6 low cost/missing
link projects have been identified. The estimated cost to
Council for these projects totals $8.1 million, with $750k for
additional low cost missing link projects.
                                                                  T
                                            AF
The Noosa Drive projects will connect to the upgraded
facilities proposed along Noosa Parade as part of the
5-year implementation plan. Combined with the Sunshine
Beach Road project, connectivity between Noosaville,
Noosa Heads and Noosa Junction will be significantly
                               R

improved, particularly for cyclists. Currently, high vehicular
traffic and pedestrian volumes combined with limited bike
riding facilities in sections is likely to discourage many
people from riding along Noosa Parade and Sunshine
                  D


Beach Road.

Future projects

For further information on projects not shown within the 5
and 10-year implementation plans, please refer to yoursay.
noosa.qld.gov.au




                                                                      39
Log in to download the original file

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan(PDF, 27MB).pdf · 28.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.