Original source · versioned page text
EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES · Attachment 3 EBFRMP Engagement Analysis Articulous
Plans and drawings: the text below has words only, no drawings.
Public access and recreation Coastal creeks and stormwater Non-specific responses that did not align
Infrastructure/s
with a theme (e.g., someone expressing their
ignage overall view on the plan and action areas)
Water quality were identified as general. Further detail on
Access the themes can be found from 7.5 onwards.
7.1% 13.1% 20.0% Assessment
21.4% 25.0%
Dog areas Creek erosion
20.2% 18.8% 7.5%
38.1% Burgess Creek
Visitors
22.5% 6.3% Infrastructure
General
General
Incidents and disaster Foreshore tenure and gazettal
management
Fire
8.5% Greater
Coastal hazards specificity
30.0% 30.0%
13.6% 27.1% Pontoons
Taking action
Role of council
22.0% 10.2%
Community 40.0%
18.6%
cleanup General
General
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original