Council archive · source document
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published] · 142008.1168
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.18 Does the proposal involve development. other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a oh Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Go to Q1.2 | Yes - (Complete Form t, Part C;) This application requires assessment by ihe relevant local government against the IDAS
Code in the Queensland Heritage Reguiaticn 2003. !f the development involves building work and the focal
goverment is nol the Assessment Manager for the application. the local government has jurisdiction as Concurrence
Agency.
Se sonal Ca ee ue mat wey
ILD RIVER AREA _
1.2 Does. the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
ee OY Yes
IPA so
sete
=
‘
ay
S
a
=
3
=
é 0 wabie 2 tem 1? IP Regulahon scneduie 1 tate 3 item > jwiks ver area} Water Art 200°
vers Act 2U95 secuan 424
ENVIRONMENTALLY RELEVANT ACTIVITY; wiLD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoats {[] Yes
WITHIN THE LIMITS OF A PORT " 1
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
NO - Go f0 01.5
C1 Yes
IP Reguigtnn someud
15 Does any part of the premises adjoin a dedared fish habitat area a under the Fisheries Act 1994?
No - Go fo Q1.6
O Yes - if answers fo questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Reguldtin, subecine 2 tabs 2 shea 26
at
(COMMUNITY INFRASTRUCTURE _|
1.6 mi part of the premises designated for community infrastructure?
N
10 - Go to Q1.7
CD Yes
IE Regulates seterhte 9 tabie 3 lor :
WASTE WATER MANAGEMENT ~~ _ _ ee 7
17 cot the proposal involve the establishment or expansion of a waste water disposal system?
No -£ndof Section 1 (] Yes
IP Reg 23
nm schentule
‘SECTION 4 « Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME a 7 }
41 Is any of the proposed operational work assessable under a planning scheme?
(11 No - Go to 04.2 Yes - (Completa Form 1, Part E) Answer Qs4.1.7 - 4.1.7 below.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.