INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist Version 21.3, 9 May 2008
‘STATE-CONTROLLED ROAD ~ . oO - ~ ‘

4.1.1 ls any part of the premises located in part ol a future State-controlled road, or within 100m of a State-controlled road?

[K] No

LJ Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
LJ No -Gotoa4.12

| Yes - This application must be seferred io the Department of Main Reads (DMR) as Concurrence Agency.

 

  

ou ae So erm erm repent mia ten 4

‘ACID SULFATE SOLS —

 

 

41.2 _ {s any of the operational work proposed in ina local goverment area listed ‘in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

1 No -Goto04.1.3 Yes
41 nurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Caspentaria, Cook, Cooloota, Dougtas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Jehnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
[Xx] No
(Yes

 

 

 

"EASEMENTS AND SUBST. ATIONS ,
4.1.3 |s any of the proposed operational work for filling or excavation?
1 No -Gotoa414

Yes

If yes, is the filling or excavation associated with reconfiguring a lot?
(1 Yes -6oto004.1.4
[Xx] No - Answer both (a) and (b) below
{a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?

No
LI Yes

(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?

No [] Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

Rogidatins s Dede 2 bagie Duem tupal JP Reg

   

SOMDike 2 late Totem kb?

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No -Gotoa4.i5 (] Yes

PF

    

aytitatennd Sel

 

 

PUBLIC PASSENGER R TRANSPORT “ : ~ ]
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

No- Go fo 04.1.6 LD Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.

fectig? fabs, gers

 

RAILWAY SAFETY AND EFFICIENCY _ . : - : 4

wenn ees . vm ee ween E
446 Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

No- Go fo 04.1.7 Oo Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.

1 Reg ste a |

 

 

 

 

2 tabts 3 ip 1

Used in these records

About this file

File size
6.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.