PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 MARCH 2019
DA_152 ILU Type H2 (2B-1G) + H2 (3B-2G) prepared by Smith + November 2018
Tracey Architects
DA_153 Independent Living Units – Roof Plans prepared by November 2018
Smith + Tracey Architects
DA_154 Independent Living Units – Elevation Sheet 1 prepared November 2018
by Smith + Tracey Architects
DA_155 Independent Living Units – Elevation Sheet 2 prepared November 2018
by Smith + Tracey Architects
DA_156 Independent Living Units – Typical Sections prepared by November 2018
Smith + Tracey Architects
DA_114 Masterplan / Carparking Layout prepared by Smith + November 2018
Tracey Architects
5. The approved development comprises the following:
Multiple Housing – Type 3 Retirement & Special Needs (122 independent living
units and apartments and 96 aged care beds)
Commercial Business – Type 2 Medical (as indicated on approved plans)
7. The development may be staged in accordance with the plan titled ‘Masterplan’
prepared by Smith and Tracey dated November 2018, Plan Ref: DA_106.
12. In conjunction with an application for operational works on the site for the first stage,
the applicant must submit an operational works application for Vegetation
Management for the development site. The Vegetation Management operational
works application must detail:
12.1. Identification of all active Glossy Black Cockatoo food trees within the
development footprint or in areas likely to be impacted upon by the operation or
construction of the development.
12.2. A Vegetation Clearing Offset program to be undertaken to re-establish the
habitat to be cleared from the site to a nearby location with similar soil
properties. A receiving site is to be identified and maintained for a specified
period (minimum 5 years) after the establishment of the receiving site.
12.3. The Vegetation Clearing Offset program must include the details of the transfer
methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
12.3.2 Methods of transfer including, inter alia, mastication of native
vegetative matter, tile transfer of live soil/plant matrix, peat locations
and extents, sexual and vegetative methods of revegetation of offset
receiving site and other deemed pertinent matters by a person with
industry experience in the successful establishment and/or re-
establishment of heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank media
off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
Page 14 of 116
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.