2019-03-12 Planning & Environment Committee Agenda

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 MARCH 2019


                12.3.6   Details of the receiving site, including tenure, contractual details,
                         establishment, monitoring and maintenance details and suitability of
                         the site for the purpose;
                12.3.7   All information must be prepared by a person with industry experience
                         in the successful establishment and/or re-establishment of heathland
                         vegetation. Industry and educational institution involvement is
                         recommended.
          The establishment of the vegetation offsets must be completed prior to the
          commencement of the use of the first stage.
    14.   The Vegetation Management operational works application must detail the location
          and extent of vegetation disturbance on Lot 9 SP252905 and Lot 6 RP901384 must
          be accurately marked on-site, including any setback requirements for bushfire
          mitigation purposes, for Council officers to inspect prior to commencement of any
          vegetation clearing.
    18.   Any lighting to the development is not to impact on the ecological values of the
          adjacent National Park and the southern portion of Lot 9 SP 252905, i.e. lighting must
          not be directed toward, and light spill must be minimised to, the adjacent National
          Park or remnant vegetation to the south. Details of the design response to this
          requirement must be submitted with the application for operational works.
    27.   Prior to the commencement of use of Stage 1 of the development, the applicant must
          construct an eastern extension of Grasstree Court, incorporating kerb and channel on
          both sides, to provide a direct connection to Ben Lexcen Drive. The intersection must
          be a full intersection generally in accordance with the plan titled Conceptual
          Intersection Details Ben Lexcen Drive and Grasstree Court Option 2 (Project No, 18-
          001942 Drawing Number 3000-SK-005) prepared by Calibre and dated 15.01.19. The
          centre of the intersection of the Grasstree Court extension with Ben Lexcen Drive
          must be located in line with the common property boundary between 38 Ben Lexcen
          Drive and 40 Ben Lexcen Drive. The Ben Lexcen Drive service road carriageway
          must be realigned as necessary to intersect at a right angle with the Grasstree Court
          extension. The roadworks and intersection must be of sufficient size to cater for large
          vehicles, including Council’s articulated library vehicle, to access Grasstree Court, the
          frontage of the local shops and the Lipton Street roundabout.
          All associated and ancillary work including pavement correction to the existing
          pavement, drainage works, modification of the footpath, and adjustments to the
          existing infrastructure shall be undertaken to complete the roadworks.
          In this regard a schedule of works, specifications and plans detailing this work shall
          be prepared and submitted to Council for approval prior to obtaining a Development
          Permit for Operational Works.
          30.1 Remove the existing roadway and footpath connection between Ben Lexcen
               Drive and the adjacent service road through the north-east corner of Lot 9 SP
               252905 and across the Ben Lexcen Drive verge. Kerb must be re-instated on
               the western side of Ben Lexcen Drive where the roadway connection currently
               joins and a concrete footpath, at least 2 metres wide, must be constructed
               along the western verge of Ben Lexcen Drive from this point up to the
               intersection with the Grasstree Court extension,
    33.   Pedestrian crossings shall be provided in Grasstree Court generally as shown on
          ‘Masterplan’ prepared by Smith and Tracey dated November 2018, Plan Ref:
          DA_106. The crossing shall include linemarking and suitable signage in accordance
          with the MUTCD.




                                                                                  Page 15 of 116
Log in to download the original file

2019-03-12 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.