Original source · versioned page text
2019-03-12 Planning & Environment Committee Agenda
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 MARCH 2019
65.4. Location of inspection and monitoring points shown clearly on the plan
65.5. A schedule or timetable for the proposed regular inspection, maintenance and
monitoring of the devices.
65.5 For proprietary products a maintenance contract of a minimum 10 years to
demonstrate that the proprietary product shall be maintained as per the
manufacturers specifications.
65.6 Details of the location and method for maintenance of any proprietary products
to demonstrate that collected pollutants and nutrients shall be disposed of in
accordance with relevant legislation.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
72. The fire-fighting demand on Unitywater’s water supply system from the development
must comply with Unitywater requirements and industry standards.
C. Delete conditions 44, 45 and 80.
D. Include the following new condition
81. Any proprietary stormwater quality improvement device included to achieve the
required stormwater quality Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan, must demonstrate only be granted an
Operational Works Approval on the following provisions:
a. A suitably qualified and experienced professional must provide independent
verification that the parameters within the node for the device in MUSIC
modelling have been tested and verified as per Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018 to achieve the predicted outcomes in the MUSIC model for the
development. For the purpose of this condition, the suitably qualified and
experienced professional must be able to demonstrate a minimum 10 years
urban stormwater testing and modelling experience and be verified in writing by
Stormwater Australia as having an appropriate reputation and track record
within the stormwater industry to provide such independent advice.
b. Where testing to achieve the certification of the proprietary stormwater quality
improvement device is from an area with rainfall intensities and patterns that
are statistically inconsistent with the region of the Noosa Shire that the device is
to be installed, and / or the size of the development the device has been tested
on is more than 2500m2 smaller than the development the device is proposed
to service, the following additional conditions apply:
i. The proprietary stormwater device treatment train must be tested and re-
verified in accordance with the Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2 December
2018. A suitably qualified and experienced professional, as verified by
Stormwater Australia must use the results from the onsite testing to re-run
the MUSIC node for the proprietary devices and confirm whether or not
the required pollutant reduction efficiencies of 80% reduction in Total
Suspended Solids, 60% reduction in Total Phosphorous and 45%
reduction in Total Nitrogen for the overall development are delivered.
ii. Where the field results and re-run MUSIC node demonstrate the required
pollution reduction efficiencies for the development are not met, the
applicant must implement additional measures to achieve the required
pollution reduction targets. The additional measures must include, in
order of priority, elevated maintenance, and then increased treatment
capacity of the stormwater quality improvement devices. Following
Page 17 of 116
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.