Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-03-12 Planning & Environment Committee Agenda

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 MARCH 2019


                          application of additional measures, the system must be retested in
                          accordance with Stormwater Australia (2018) Stormwater Quality
                          Improvement Device Evaluation Protocol. Version 1.2 December 2018.
                          Where pollution reduction targets continue to not be demonstrated the
                          proprietary device must be removed and replaced with a bio-retention
                          device constructed in accordance with an Operational Works approval or
                          the applicant must enter into an agreement with Council to provide
                          improved water quality outcomes within the catchment area.
                   iii.   A separate water quality performance bond must be provided prior to any
                          pre-start meeting for the development. The water quality performance
                          bond must be 150% of the cost of water quality monitoring required to
                          comply with Stormwater Australia (2018) Stormwater Quality
                          Improvement Device Evaluation Protocol. Version 1.2 December 2018.
                          The performance bond will be incrementally returned annually for the
                          value of monitoring works completed that year. The full value of the bond
                          shall be returned upon demonstration that the development delivers the
                          required pollution reduction targets.
E.      Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT
1.      PROPOSAL
The applicant seeks approval to change an existing development approval. The approved
development comprises a residential aged care (RAC) facility, with 96 beds and ancillary uses
(medical, allied health, nursing and respite care) over two levels, and a retirement village which
comprises 4 independent living apartment (ILA) buildings with a total of 54 apartments over two
levels with basement car parking; 55 single level villa style independent living units (ILU’s) and a
central facilities building comprising 20 serviced ILA’s and a recreation centre for all ILU
residents.
The applicant has advised that:
        The proposed minor change relates to the Material Change of Use component of the
        development approval only. The reconfiguration of a lot approval was enacted in 2013
        which has resulted in current Lot 9 on SP252905 and Lot 1 on SP239726 to the south
        which was dedicated to Council for conservation / national park purposes.
        Several minor changes are proposed to the development approval to bring the approved
        product up to current market standards for retirement living and aged care and to reflect the
        current preferred ‘care model’ for future residents of all product types.
The specific changes are detailed below:
Yield
The change seeks to amend the yield by:
      Removing the 2 respite beds from the residential aged care facility;
      Deleting the 20 serviced apartments and replacing them with 15 Independent Living
        Apartments (ILA’s) thereby increasing the total number of (ILA’s) on the site from 54 to 69;
      Reducing the number of Independent Living Units (ILU’s) from 54 to 53;
      Reducing the gross floor area of the central facilities building from 1,017m2 to 973m2
        (reduction of 44m2).



                                                                                     Page 18 of 116
Log in to download the original file

2019-03-12 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.