Original source · versioned page text
Planning report
REPORT
businesses (Ie food and drink outlets)
in the precinct.
6.7.6 Infrastructure Contributions
The application is subject to the requirements of the Noosa Shire Council Charges Resolution (N0.5.1) 2020.
The applicable charge for the development is calculated as follows:
Charges
• Defined Use: Office
• Defined GFA: 70m²
• Charge:
– Council Apportionment (Transport) excluding stormwater (85%): $128.47 per M² of GFA
– Unity Water Apportionment (Sewer and Water) excluding stormwater (15%): $22.68 per M² of GFA
– Stormwater: $10.80 per m² of impervious area
• Calculations:
– 70 x $128.47 = $8992.90
– 70 x $22.68 = $1587.60
– There is no charge for stormwater as there is no increase (extra demand) in impervious area, as no
building works involved.
Credits
• Defined Use: Caretaker’s residence (1 bedroom or less)
• Council Apportionment (transport and Stormwater) (60%): $8818.84
• Unity Water Apportionment (Sewer and water) (40%): $8636.00
Overall Contribution:
• Council Apportionment $8992.90 - $8818.84 = $174.06
• Unity Water Apportionment $1587.60 - $8636.00 = -$7084.40 = $0
Town Planning Report for a Development Application | Version 2 | 22 June 2021
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.