Minor Change Existing Approval - MCU25 0136 01 (As Published)
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. A stormwater quality treatment system in accordance sections 3 and 4 of Planning
Scheme Policy 6 Engineering Design Standards.
b. On-site detention to ensure the peak flow rate is attenuated during all events up to the
1% AEP event adjusted for climate change.
c. 3,000 litres of rainwater storage per dwelling for non-potable reuse purposes.
d. An upgrade to the existing stormwater pit in the Olivine Street road reserve that allows
for the conveyance of stormwater flow:
i. from the existing upstream table drain; and
ii. from the Olivine Street road formation, including an allowance for the
construction of future kerb and channel upstream.
Services
15. Underground reticulated electricity and telecommunication services must be provided to
each lot/unit in accordance with the standards and requirements of the relevant service
provider.
16. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
17. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
18. The development must provide a 2.0 metre Public Thoroughfare easement across the full
frontage of the site to Olivine Lane. The easement must be registered prior to
commencement of use and be free of all permanent structures, including but not limited to,
retaining walls, footpaths, pedestrian stairs and boundary fences.
19. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
20. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
21. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
22. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with an Operational
Works approval and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
23. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 4 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Minor Change Existing Approval - MCU25 0136 01 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.