5 Impact Assessment
5.1 Road Network Capacity
An additional 8 trips to the eastbound traffic volume on Doonella Street is less than 1% of the existing
background traffic during the AM peak hour. It is assumed the PM peak hour would be similar, but a reverse
flow (tidal). The PM impacts would be of a similar scale.
Likewise, for the intersection approaches, assuming that the majority of the traffic observed mid-block on
Doonella Street is through traffic (west to east), then the approaches to the roundabouts would have similar
volumes as mid-block.
The development traffic as a percentage of existing traffic is illustrated on the diagram below.
Figure 5-1 Development Traffic Impact (AM peak hour)
936
2
0.2%
443
8
2%
Development Site
936
8 936
8 936
1% 8
1%
1%
443
999 = Observed Traffic 6
X% = Development impact 1.3%
Source: Nearmap
12 February 2017 Greys 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Parking & Traffic Impact Assessment Report_1502017.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.