Council archive · source document
06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published] · 142006.159
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 15.0, 18 November 2005
Operational work below high water 10. The application involves operationat work that is: ( tick the applicable box/es)
mark terrain reer o Guide 18. For more (J) (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in jocal Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or
government tidal areas refer to Guide 24. sey ge . . 2 14. .
Unless you answered ‘none ofa above" to O10, oO ti) tidal work that is prescribed tidal work complete Part P of Form 4; OF
the seplcaien tapes referral to Queengland (1 {iii) carried out within a coastal management district'® under the Coastal Act and for -
{tien
Concurrence agency. * 1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assesament manager for eil M of Form 1;
Prescrfoed tidal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; oF
C1 (c) constructing a canal’s, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
Kl (iv) none of the above.
Coastal management 11. The application involves: {tick the applicable boxes)
Foc mara infernabon refer to Guide 18, Ci() a material change of use assessable under a planning scheme involving operational
ee eset work carried out completely or partly in a coastal management district's
Environments! Protection Agency (EPA), Di) a material change of use assessable under a planning scheme involving building
If ther than EPA |s th: nt T i istris ig —
sranoner forthe olcation, EP hic a concurrence work, carried out completely or partly in a coastal management district that is
agency for the application in relation to this matter. « the construction of a new premises with a GFA’ of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
(1 (il) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(Civ) reconfiguring a fot'® assessable under schedule 8 of the PA and in connection with
the construction of a canal'® - complete Part M of Form 1
[(v) none of the above
Development within the limits of a... | 12. Does the application involve development below high water mark’ and within the limits of a port
port: under the Transport Infrastructure Act 1994?
For more information refer to Guide 18, For 4 NO
information about prescribed tidal work refer to
Suite 24. LD YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
if you answered “YES” to Q12, the application
Iniggers referral to the Port Authority.
‘The Port Authority is a concurrence agency if the
development is ~
@ within 200m of @ shipping charmel or an entry
‘and ext shipping corridor for the.port
© within 1000m of 2 swing basin,'a commercial
shipping wharf, a mooring, anchorage or spalt
grounds;
‘© within 1000m of a planned port facility identified
ina land use plan approved under the Transport
infrastructure Act 1994.
{nal other shuation the Port Authority is an advice
agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
fal work reer to Guida 24. The foal poverment Bt No
Xe smeacerers connor fer wt prescribed Wal (2 YES - complete Part M af Form 1, or Part P of Form ¢ ifthe tidal work is prescribed tidal work
W you answered “YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal 14, Does the application involve tidal works within a strategic port land tidal area2"?
areas
For more information refer to Guide 18.
Unless you answered “NO” io Q14, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT) are
Concurrence agencies for the application.
$2) NO
(1 YES - camptete Part M of Form 1
12 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain lidal works completely or partly within a local govemment tidal area.
18 Coastal management district is defined in sch 10 of the IPA and means a coastal management distict under the Coastal Protection and Management Act 1995, other than an area declared as a
coaslal management district under section 47(2) of thal Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFA ts defined in sch 14 of the (PA to mean the gross floor area. For a definition of how to calculated GFA, go lo the planning scheme against which the application is being assessed.
18 Under $117 of the Coastal Protection and Management Act 1995. an application for raconfiguration, where the reconfiguralion is associated with he construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arlificial waterway.
19 High water mark is defined in the Coastal Protection and Management Act 1995 and maans the ordinary high water mark at spring tide.
20 Marna is defined in the Transport Operations (Maritime Potution) Regulation 1995,
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.