06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published] · 142006.159
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 15.0, 18 November 2005
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For turther information refer to Guide 19. Queensiand Heritage Act 1992?
if you answered “YES” to Q15, the application | wv NO
‘triggers referral to the Queensiand Heritage Council
las concurrence agency for the application. [C1 YES - complete Part C of Form 1
Declared catchment areas 46. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, inciuding a list of the deciared
catchment areas within Queenstand, refer to Guide
13.
Uniess you answered “none of the above" to 16,
the application requires assessmorit by the
Department of Natural Resources snd Mines:
(NREM).
fan apancy other than NR&M Is the assesement
manager for the application, NR&M is a concurrence
agency for the eppication in relation to this matter.
involves: (lick the applicable box/es)
(1 (i) reconfiguring a tot, if any lot resulting from the reconfiguration is less than 16 hectares;
L(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
56 Gi)
Contaminated land 17. The application involves: (tick the applicable boxes)
cations involv teria! change of use and / 7 ‘, i i -
Applica rfiguing ehamay tigger pas dal Ow reconfiguring atot for which all of part of the premises are
For more information refer to Guide $, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
Unless you answered “none of the above" to 017, « item 5, including the exemption otherwise provided for by paragraph (d};
the appicalion requires sasessmen by the « item 6, including the exemption otherwise provided for by paragraph (e); or
agancy other than EPA fs the oe manager « item 7, including the exemption otherwise provided for a mining activity or petroleum
for the application, EPA will be 8 concurrenca activity; or
lagency:for the application in ralalion to this matter. (b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
0 (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
(ALi) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For mare information rater to schedule 2of the JP (i) reconfiguring a lot where any part of the lot is —
Unless you anewered “none of the above’ to C18, . Subject to an easement in favour of a distribution entity or transmission entity under the
the application triggers referral to the agency 1 Electricity Act 1994 and the easement is for a transmission grid or supply network under
wlohe ensement i arnied favour of as advice that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
» any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a jot if any part of the premises is situated within 100m of a substation
site;
C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if —
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
« the work is located wholly or partly within 10m of a substation site;
vn (¥) none of the above.
O iii
D iii)
21 Strategic port land tidal areas are the areas generally 50 matres seaward of high water mark adjacent lo strategic porl land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.