Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN Cc Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH STORMWATER QUALITY MANAGEMENT PLAN PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH TABLE OF CONTENTS 1. INTRODUCTION 0... eeccesssscesscsseeesenseeasssesecessnsnecasecosesscessauseanenesaneasnersaseceascoesenaseanene 1 2. STORMWATER MANAGEMENT AND WATER HARVESTING. ..........:ceccsssssessesseessecneesee 1 2.1 Site Characteristics..........0. cece ceeeessseccececeeeeeeeeeeensssseeeesseaeeeesssaaeeeeesnueereeseeeesenenaes 1 2.2 Water Cycle Management Concept...... 1 2.3 Stormwater Runoff from Site Catchments....... wid 2.4 Re-use of Stored Non-Potabie Water ............. wid 2.5 Water Re-use Criteria... ccc cessseecceeeeeseeeeeees 2 2.5.1 Roof Catchment Areas..............c0. cece v2 2.5.2 Storage Tanks ....... ccc ecccceceseeecesccessecesscesesseesseesssssecssnseeneenessaeenesieseeseneeages 2 3. STORMWATER QUALITY .........csccccssccecseccensesntenecensessssecesessassnnscnevsrsssseeseunenseesensceensaereasens 3 3.1. Water Quality Management Concept.... beseeaceeseeevnneesateets 3 3.2 Receiving Waters 0.0... cece eee eteeeeeeteeee 38 3.3. Stormwater Quality Control & Treatment ........... ee 3 3.4 Management of Water Quality during Construction Phase..... wd 3,5 CONCIUSIONS ........ eee eccceececeeeeeeceeceeeeeeeecesesseeerseeereseeeeaseeseescnsesenseeeenseeesseeeeeeneeesoaeens 3 4. DISCHARGE TO EXISTING DRAINAGE SYSTEM .............:sscsssessrsecsesteesensssesssaneenecsanees 3 4.1 Stormwater Detention 2.2.0.0... cece essen enssesseeeeenseereseesseeensessseseeseeeseneeeeceaeeenaes 4.2 Discharge to existing SySteM ............ ec ee ences teeters 4.3 Assessment of Detention Storage ve 4A CONCIUSIONS ........ ccc ccccceceeeccccteeeceeeeeeeseeeeeeesesseseeeressseeeeeseeessesaeeeeeenesaeeeeeteaeenaneeecnd LIST OF TABLES Table 1 Summary of Peak Discharges for the 10 and 100 Year ARI ............0: ieee 5 LIST OF FIGURES Figure 1 10 Year ARI Existing Results Figure 2 10 Year ARI Developed (Mitigated) Results Figure 3 100 Year ARI Existing Results Figure 4 100 Year ARI Development (Mitigated) Results APPENDICES APPENDIX A _Cardno Proposed Stormwater Drainage Plans Comiskey Group Page ii 18 June 2008 238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.