Skip to the record
Search everything, all in one place.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

TABLE OF CONTENTS

 
  
  

 

1. INTRODUCTION 0... eeccesssscesscsseeesenseeasssesecessnsnecasecosesscessauseanenesaneasnersaseceascoesenaseanene 1

2. STORMWATER MANAGEMENT AND WATER HARVESTING. ..........:ceccsssssessesseessecneesee 1
2.1 Site Characteristics..........0. cece ceeeessseccececeeeeeeeeeeensssseeeesseaeeeesssaaeeeeesnueereeseeeesenenaes 1
2.2 Water Cycle Management Concept...... 1
2.3 Stormwater Runoff from Site Catchments....... wid
2.4 Re-use of Stored Non-Potabie Water ............. wid
2.5 Water Re-use Criteria... ccc cessseecceeeeeseeeeeees 2

2.5.1 Roof Catchment Areas..............c0. cece v2
2.5.2 Storage Tanks ....... ccc ecccceceseeecesccessecesscesesseesseesssssecssnseeneenessaeenesieseeseneeages 2

3. STORMWATER QUALITY .........csccccssccecseccensesntenecensessssecesessassnnscnevsrsssseeseunenseesensceensaereasens 3
3.1. Water Quality Management Concept.... beseeaceeseeevnneesateets 3
3.2 Receiving Waters 0.0... cece eee eteeeeeeteeee 38
3.3. Stormwater Quality Control & Treatment ........... ee 3
3.4 Management of Water Quality during Construction Phase..... wd
3,5  CONCIUSIONS ........ eee eccceececeeeeeeceeceeeeeeeecesesseeerseeereseeeeaseeseescnsesenseeeenseeesseeeeeeneeesoaeens 3

4. DISCHARGE TO EXISTING DRAINAGE SYSTEM .............:sscsssessrsecsesteesensssesssaneenecsanees 3
4.1 Stormwater Detention 2.2.0.0... cece essen enssesseeeeenseereseesseeensessseseeseeeseneeeeceaeeenaes
4.2 Discharge to existing SySteM ............ ec ee ences teeters
4.3 Assessment of Detention Storage ve
4A CONCIUSIONS ........ ccc ccccceceeeccccteeeceeeeeeeseeeeeeesesseseeeressseeeeeseeessesaeeeeeenesaeeeeeteaeenaneeecnd

LIST OF TABLES

Table 1 Summary of Peak Discharges for the 10 and 100 Year ARI ............0: ieee 5

LIST OF FIGURES

Figure 1 10 Year ARI Existing Results

Figure 2 10 Year ARI Developed (Mitigated) Results
Figure 3 100 Year ARI Existing Results

Figure 4 100 Year ARI Development (Mitigated) Results

APPENDICES

APPENDIX A _Cardno Proposed Stormwater Drainage Plans

 

Comiskey Group Page ii 18 June 2008
238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.