Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN Cc » Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 1. INTRODUCTION Cardno has been commissioned by Comiskey Group, to provide a report addressing the stormwater management for a proposed development at Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine Beach. This report is to accompany the application to Sunshine Coast Regional Council (SCRC) for Operational Works approval of the proposed development. The relevant issues are addressed in the following sections. 2. STORMWATER MANAGEMENT AND WATER HARVESTING 2.1 Site Characteristics The applicant is seeking to develop Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine Beach through the construction of a Childcare Centre development with the provision of car parking. The existing site has a Council approval DA06/1180. The proposed development comprises approximately 410m? of building and 461m? of hardstand and carparking. The total site area is 1614m? and the proposed development will create catchments at a number of levels including roof area, paved areas and recreational landscaped areas. 2.2 Water Cycle Management Concept Stormwater runoff from the site will be managed in accordance with the principles of Water Sensitive Urban Design (WSUD) as expressed by the following performance criteria and objectives (Melbourne Water, 2005): > Recycle stormwater for non-potable use (to reduce demand on water resources); > Protect and enhance natural water systems within urban developments; > Integrate stormwater treatment into the landscape; > Use stormwater infrastructure in the landscape to maximise visual and recreational amenity; Vv Control and improve the quality of water draining from the urban development; > Minimise the drainage infrastructure cost of development. The management concept aims to comply with SCRC requirements in terms of: > Water quality; > Water reuse. Comiskey Group Page 1 18 June 2008 238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.