Skip to the record
Beware of cheap imitations.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN Cc » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

1. INTRODUCTION

Cardno has been commissioned by Comiskey Group, to provide a report addressing the
stormwater management for a proposed development at Lot 31 on RP149005 at 71 Pacific
Avenue, Sunshine Beach.

This report is to accompany the application to Sunshine Coast Regional Council (SCRC)
for Operational Works approval of the proposed development. The relevant issues are
addressed in the following sections.

2. STORMWATER MANAGEMENT AND WATER HARVESTING

2.1 Site Characteristics

The applicant is seeking to develop Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine
Beach through the construction of a Childcare Centre development with the provision of car
parking. The existing site has a Council approval DA06/1180.

The proposed development comprises approximately 410m? of building and 461m? of
hardstand and carparking. The total site area is 1614m? and the proposed development will
create catchments at a number of levels including roof area, paved areas and recreational
landscaped areas.

2.2 Water Cycle Management Concept

Stormwater runoff from the site will be managed in accordance with the principles of Water

Sensitive Urban Design (WSUD) as expressed by the following performance criteria and

objectives (Melbourne Water, 2005):

> Recycle stormwater for non-potable use (to reduce demand on water resources);

> Protect and enhance natural water systems within urban developments;

> Integrate stormwater treatment into the landscape;

> Use stormwater infrastructure in the landscape to maximise visual and recreational
amenity;

Vv

Control and improve the quality of water draining from the urban development;
> Minimise the drainage infrastructure cost of development.

The management concept aims to comply with SCRC requirements in terms of:

> Water quality;
> Water reuse.

 

Comiskey Group Page 1 18 June 2008

238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.