Skip to the record
Beware of cheap imitations.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN < i Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

4.4 Conclusions

Based on the results from the XPSWMM model it was identified that the limiting constraint
for the site was the restriction on the discharge from the minor drainage system of 25L/s.
The resulting detention volumes afforded significant reductions in peak discharges for each
storm analysed.

The modelling has demonstrated that the site is able to ensure peak discharges are non-
worsened in accordance with the requirements of the SCRC and the Queensland Urban
Drainage Manual.

 

Comiskey Group Page 8 18 June 2008

238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.