Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN < i Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 4.4 Conclusions Based on the results from the XPSWMM model it was identified that the limiting constraint for the site was the restriction on the discharge from the minor drainage system of 25L/s. The resulting detention volumes afforded significant reductions in peak discharges for each storm analysed. The modelling has demonstrated that the site is able to ensure peak discharges are non- worsened in accordance with the requirements of the SCRC and the Queensland Urban Drainage Manual. Comiskey Group Page 8 18 June 2008 238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.