Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER QUALITY MANAGEMENT PLAN PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Gq Cardno Conduit Link3 from Existing to Node4 25 [Max 0 127] 45 [Max 0.110} — — 30 [Max 0 120} 60 [Max0 114] 120 [Max 0 066) —_— —= 15 [Max 0.129) 20 [Max 0 126) — 10 [Max 0 106} 012 010 009 008 3007 0.06 005 004 003 002 001 0.00 1Sun Jan 2006 Time 100 Year ARI Existing Results Conduit Link4 from NodeS to Outlet Figure 3 we —_—— — a) — — — 10 [Max0.043] 15 [Max0.046] 20 (Max0.050) 25 (Max0.052] 30 (Max0.051] 45 [Max0.048] 60 [Max 0.053} 120 [Max 0.047] 005: a 0.050 0045 0040 0.035 0020 0015 0010 0.005 0.000 180 [Max 0.065} 180 [Max 0.044] 1Sun 1AM Jan 2006 Figure 4 2AM Time 100 Year ARI Development (Mitigated) Results Comiskey Group Page 7 238401 ML Stormwater Quality Report doc Commercial in Confidence 18 June 2008 Version 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.