SITE EROSION AND SEDIMENT PLAN » roi
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Cc Ca mo

 

 

3. STORMWATER QUALITY IMPROVEMENT DEVICES
3.1 GPT’s
Two “Clearmake” GPT’s are to be installed within the internal pipe network. Once installed,
the devices will collect large particle sediment that is washed into the pipe system from the
carpark area. These devices are to remain as part of the overall stormwater quality
treatment train for the finished development.
4. EROSION AND SEDIMENT CONTROLS PHASING
4.1 Phase 1 — Prior to commencement of construction
e Construct construction entrance
Install silt fences and cut off drains
e Install inlet filters
4.2 Phase 2 — Bulk Earthworks
Strip top soil to stockpile and fence stockpile
Monitor construction entry/dust levels
Review erosion and sediment devices weekly and after heavy storm events and
repair as required
¢ Spread top soil from stockpile and mulch landscape areas as earthworks are
completed
4.3 Phase 3 — Civil and building construction
¢ Monitor construction entry/dust levels
» Review erosion and sediment devices weekly and after heavy storm events and
repair as required
4.4 Phase 4 — Post construction
« Remove sediment fences
e Decommission inlet filters
5. MAINTENANCE AND MANAGEMENT
5.1 Maintenance considerations
Maintenance inspections need to be carried out at least weekly and prior to and after
rainfall events. The site foreman is responsible for the maintenance of all sediment and
erosion contro! devices.
COMISKEY GROUP Version 1 148 June 2008

238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence Page 3

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.