SITE EROSION AND SEDIMENT PLAN a >. real PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH CG a mo 1.3.5 Rehabilitation Method The finished surface of the development will be rehabilitated according to its location and intended final use. The majority of the site will be covered with buildings and concrete pavements. All landscape areas and batters are to be prepped, topsoiled, mulched and revegetated. Prior to the placement of any topsoil the surface is to scarified/roughened along the contour. Topsoil is only to be moved when it is in a damp condition to ensure the soil aggregate condition is maintained. 1.3.6 Receiving environment The development is adjacent to the David Low Way with an existing drainage network to which the internal catchment network will be connected. This existing drainage system eventually flows to the Girraween Reserve. 1.3.7 External Catchments One external catchment, part of an adjoining residential lot, contributes stormwater that runs through the proposed construction site. 1.4 Acid Sulphate Soils Acid Sulphate Soils are not expected at this site and no detailed investigation was undertaken. 2. SEDIMENT AND EROSION CONTROL DEVICES The following devices are proposed to be used during the construction of the development. 2.1 Sediment Fences Sediment fences are to be constructed as close as possible to follow the contours of the site. Sediment fences are to be installed in accordance with the standard details supplied in the IEAust (QLD) ESC Guidelines June 1998. 2.2 Mulching / Revegetation All landscape areas are to be mulched immediately after final formation. The entire landscaped areas of the site are undergoing a major landscape program to bring back the natural flora characteristics of the area. 2.3 Kerb Entry and Field Inlet Filters As kerb entry pits and field inlets are built, inlet filters are to be placed immediately to minimise the amount of sediment entering the pipework and the sediment ponds. COMISKEY GROUP Version 1 18 June 2008 238401 ML Site Erosion and Sediment Report.doc = Commercial in Confidence Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.