Skip to the record
The only place to find full transcripts.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ENVIRONMENTAL MANAGEMENT PLAN CC Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ENVIRONMENTAL MANAGEMENT PLAN

TABLE OF CONTENTS

1. PREAMBLE TO THE ENVIRONMENTAL MANAGEMENT PLAN.............cccecccsssecssseeeeeee 1
4.1 Terminology ......... ee cece eects eecteeeneeeeeeeeeeeennereeeeeesesseneeeeessaneteeereesesatecessneneennpessaaeetoes 1
1.2 Program and Contractual Obligations 00.0.0... cece eee cree eneeereeersenarneesnseseese 1
1.3 Corrective ACtiOn 0.0... cece eee eneeceeseseneeeseersnsceacessceesaseaeceaestenecssetitesesatessaeeerenate 2
1.4 Management of the Site... ees eeceeenneeesceenecesseneesseateeetreseedeeseeeserenae 2

2. SITE FACTORS. .......sssecssesescsecsssersccscsncenseseserssnenenscaossecuesseessnessdssnessceessesseacenesoucneeegenessssonss 3
2.1 Gemeral Description ........0.. cece ceceessescreesecesssueeecesseceneeessceusaeeecesseaaneeeeeeeeeessceneags 3
2.2 Engineering Constraints... eccceceseeeneccneeereseneesneseaeenseseaeesiiesneseiseesteesenaeeenene 3

3. METHODS 2... ec eceesseeeeceseesensseesesssnseneessnvecessssesseneneaseeneceudscarseceaseeseossecsnsserasseoansnaeaansets 3
3.1 COMSTHPUCTION. 0... eee cee cceenee ee tine eee cbeeeetndeeeceueecenaeeseeeeneaeesenbereseeaeeetenaeteneneeeaaa 3
3.2  MOMIBOFiNg......... cece eeeeeeerrettereceeeteeeessaaeeeeseeessdeeeecsenueeseeeeeeeaeeescesaaaareeeateeseenieees 3

CONSTRUCTION ELEMENTS

 

ELEMENT C1 Site Control and Waste Management Plan

ELEMENT C2 Community Amenity

ELEMENT C3 Air Quality

ELEMENT C4 Noise Control

ELEMENT C5 Erosion and Sedimentation Control

ELEMENT C6 Site Restoration and Rehabilitation

OPERATIONAL ELEMENTS

ELEMENT 01 Site Restoration and Rehabilitation

APPENDIX A Sample Corrective Action Request Form
Preliminary O Author Mike Laverty
Draft O Signature
Draft Final O Date 18 June, 2008
Final Oo Reviewer Gavin Fields
Superseded Oo Signature
Other (Specify) O Date

 

This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client in accordance with the terms of the
retainer. Cardno (Qld) Pty Ltd does not and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by any third party on the content of this document.

© Cardno (Qld) Pty Ltd All Rights Reserved 2008. Copyright in the whole and every part of this document belongs to Cardno (Qld) Pty
Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media, to any
person other than by agreement with Cardno (Qld) Pty Ltd

 

Comiskey Group ii 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.