Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc y Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH 1. PREAMBLE TO THE ENVIRONMENTAL MANAGEMENT PLAN 1.1 Terminology The term Superintendent refers to the present owner/developer of the site, and its successors in title. The Contractor refers to the party or company performing construction works on site, and includes all employees of the Contractor and sub-contractors. The Consultant refers to the civil engineering design consultant employed by the Superintendent. Council refers to the Sunshine Coast Regional Council EPA refers to the Environmental Protection Agency EMP refers to the Environmental Management Plan 1.2 Program and Contractual Obligations The EMP is divided to reflect the two phases of the construction program, construction and operation. The construction phase refers to the period from the commencement of works on site to the substantial completion of the works. The Contractor is generally responsible for ensuring that the provisions of the Environmental Management Plan are met, except for certain planning or design issues, which are explicitly noted as being the responsibility of the Superintendent or Consultant, as appropriate. The operational phase refers to the period following completion of the construction activity, whether for an individual element of the works, or the entire project. Operational phase relates to the period from substantial completion to the expiry of the on- maintenance period (sometimes referred to as the defects liability period, or the defects correction period). In these cases, the Contractor is generally responsible to ensure that the provisions of the EMP are met during this period, and that the permanent works (gross pollutant traps, rehabilitation works etc.) function as intended. Upon the expiry of the on-maintenance period, infrastructure works (roads, drainage etc) will be accepted by Council, who then become responsible for their maintenance. Council may wish to adopt its own environmental management and monitoring program during the operational phase. In these cases, the EMP should be regarded as a condition of the contract between the Contractor and the Superintendent. Although the Superintendent may hold ultimate responsibility to ensure that the proposed development complies with relevant environmental legislation, such as the Environmental Protection Act (EPA) 1994 and the Environmental Protection (Water) Policy 1997 (EP(W)P), its duties regarding construction are subordinated to the Contractor by the contract. Comiskey Group 1 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.