ENVIRONMENTAL MANAGEMENT PLAN Cc ) Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Register which will be developer and maintained by the Contractor. Copies of CARs shall be provided to Council upon request. The Contractor shall implement the corrective action as required within the agreed time frame noted on the CAR. The Contractor shall advise the Superintendent upon completion of the corrective action. Table C3.1 Air Quality Criteria as per Environmental Protection (Air) Amendment Policy (No. 1) 1998 - Dust Emission PARAMETER MAXIMUM ACCEPTABLE CONCENTRATION Annual, 24 hour averaged dust concentration, total 90 pg/m® suspended particulate Annual, 24 hour averaged dust concentration, as PMio 50 g/m? 24 hour average dust concentration, as PMio 150 pg/m® Visibility 20 km Average dust deposition rate 120 mg/m?/day Note: PM49 is suspended particulate matter less than 10 microns in diameter. Comiskey Group 8 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.