ENVIRONMENTAL MANAGEMENT PLAN q » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Earthworks
Earthworks shall be managed to control dust. Specific control measures
include;

e Completion of vegetation clearing in stages, in order that a minimum area
of ground is open at any one time

¢ Early stabilisation and revegetation of cut or filled areas and slope works
using, for example, wood chip layers
Watering of all exposed areas, including haul routes
Provision of windbreaks and silt fences as required.

Deliveries
Deliveries shall be managed to control dust. Specific control measures
include;

e Covering of loads entering and leaving the site
@ e Collection of material which falls from trucks or their wheels on a daily
basis
« Removal of soil from wheels of vehicles which leave site

Stockpiles
Stockpiles shall be managed to control dust. Specific control measures

include;

e Minimisation and stabilisation of stockpile areas. Stabilisation shall be
undertaken by ensuring that angles of repose are not exceeded and, if
necessary, by the placement of supporting structures to retain the
stockpile within a designated area. If required, the surface of the stockpile
shall be covered with either mulched vegetative matter, or an artificial
cover, suitably weighted to prevent movement.

e Maintenance of stockpiles within designated areas and prevention of
spread of stockpile material into adjacent areas.

e Creation of no more stock piles than are necessary, and removal of all
stockpiles upon completion of works on site.

} ¢ Provision of windbreaks and silt fences as required.

MONITORING: Daily inspections of the site by the Contractor of the types, locations and
details of control measures in place. Weekly recording by the Contractor on
the effectiveness of control measures in place.

Recording by the Contractor of all air quality complaints received and details
of all control measures undertaken.

In the event of a dispute, an independent party, such as the Consultant shall
implement bulk air quality monitoring. The Contractor shall take necessary
action should the limits in Table C3.1 be exceeded.

REPORTING: The Contractor shall submit monthly reports to the Superintendent on the
monitoring activities, control measures and corrective action undertaken. All
reports and records will be provided to Council upon request.

 

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action
ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Comiskey Group 7 18 June 2008

Environmental Management Plan Rev: 4 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.