Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN q » Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Earthworks Earthworks shall be managed to control dust. Specific control measures include; e Completion of vegetation clearing in stages, in order that a minimum area of ground is open at any one time ¢ Early stabilisation and revegetation of cut or filled areas and slope works using, for example, wood chip layers Watering of all exposed areas, including haul routes Provision of windbreaks and silt fences as required. Deliveries Deliveries shall be managed to control dust. Specific control measures include; e Covering of loads entering and leaving the site @ e Collection of material which falls from trucks or their wheels on a daily basis « Removal of soil from wheels of vehicles which leave site Stockpiles Stockpiles shall be managed to control dust. Specific control measures include; e Minimisation and stabilisation of stockpile areas. Stabilisation shall be undertaken by ensuring that angles of repose are not exceeded and, if necessary, by the placement of supporting structures to retain the stockpile within a designated area. If required, the surface of the stockpile shall be covered with either mulched vegetative matter, or an artificial cover, suitably weighted to prevent movement. e Maintenance of stockpiles within designated areas and prevention of spread of stockpile material into adjacent areas. e Creation of no more stock piles than are necessary, and removal of all stockpiles upon completion of works on site. } ¢ Provision of windbreaks and silt fences as required. MONITORING: Daily inspections of the site by the Contractor of the types, locations and details of control measures in place. Weekly recording by the Contractor on the effectiveness of control measures in place. Recording by the Contractor of all air quality complaints received and details of all control measures undertaken. In the event of a dispute, an independent party, such as the Consultant shall implement bulk air quality monitoring. The Contractor shall take necessary action should the limits in Table C3.1 be exceeded. REPORTING: The Contractor shall submit monthly reports to the Superintendent on the monitoring activities, control measures and corrective action undertaken. All reports and records will be provided to Council upon request. CORRECTIVE Non-conformance with this plan shall be documented and a corrective action ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance Comiskey Group 7 18 June 2008 Environmental Management Plan Rev: 4 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.