Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ENVIRONMENTAL MANAGEMENT PLAN Ci Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

MONITORING: The Contractor shall perform weekly inspections of all noise producing
sources (including inspection of new items of plant before they commence
work on the site).

If complaints about noise are received, the Contractor shall visit the location of
the complaint to determine its validity and implement appropriate mitigation
measures, if required. In the event of a dispute, an independent party, such as
the Superintendent, shall undertake noise monitoring.

The Contractor shall keep a written record of all complaints and subsequent
noise monitoring and remediation measures.

REPORTING: Monthly reports by the Contractor, to the Superintendent, on monitoring,
control measures and corrective actions taken.

CORRECTIVE Non-conformance shall be documented, by the Contractor, and a corrective
ACTION: action request (CAR) issued. All CAR’s shall be included in the Non-
conformance Register maintained by the Contractor.

The Contractor shall implement the corrective action, as required, within the
agreed time frame noted in the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

Tabie C4.1 Recommended Hours of Operation

 

Recommended Hours of Operation

7.00am to 7.00pm.
Monday to Saturday

 

 

 

 

 

Comiskey Group 10 18 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.