ENVIRONMENTAL MANAGEMENT PLAN C i >) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C5 — EROSION AND SEDIMENTATION CONTROL
POLICY: To minimize the impact of soil erosion on or outside the construction site.

PERFORMANCE Limitation of erosion of soil within the construction site.

 

OBJECTIVES:

Prevention of transport of eroded material from the construction site.

If vegetation growth fails in any area, vegetation is to be established, and the

re-vegetation strategy modified appropriately to prevent further failure.

Otherwise, corrective action will consist of replacement of damaged or failed

control devices.

CONTROL A Site Erosion Control Plan shall be prepared by Cardno and approved by
MEASURES: Council prior to any works commencing on site. No site works shall be
permitted until the Plan is approved by Council.

The following mechanisms shall be used to control erosion on the site, and to

prevent discharge of sediment contaminated runoff to receiving waters:

e Where possible, earthworks shall be completed in stages, such that a
minimal area of ground is open at any one time.

e Perimeter bunds shall be constructed around disturbed areas to divert
external catchment flows around these areas. Silt fences shall be used to
prevent sediment transport from disturbed areas in close proximity to
receiving waters.

¢ Drains shall be protected from scour using regular check dams made from
rock rubble. Drains may be lined with turf, rock or sprayed concrete if
required.

e Sediment traps are to be used in conjunction with drainage lines to collect
silt contained in the runoff.

¢ Soil stockpile areas are to be stabilized to prevent erosion.

e Embankment slopes shall be stabilized following construction to retain
vegetation, moisture and topsoil and promote successful planting.

e Where areas are required to remain open for any significant period of time
prior to re-vegetation and/or stabilization, the soil surface shall be covered
with straw or other suitable material to prevent raindrop splatter.

Erosion and water quality control activities on the site shall generally be in

accordance with Table C5.1

Comiskey Group 41 18 June 2008

Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.