Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN C i >) Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH ELEMENT C5 — EROSION AND SEDIMENTATION CONTROL POLICY: To minimize the impact of soil erosion on or outside the construction site. PERFORMANCE Limitation of erosion of soil within the construction site. OBJECTIVES: Prevention of transport of eroded material from the construction site. If vegetation growth fails in any area, vegetation is to be established, and the re-vegetation strategy modified appropriately to prevent further failure. Otherwise, corrective action will consist of replacement of damaged or failed control devices. CONTROL A Site Erosion Control Plan shall be prepared by Cardno and approved by MEASURES: Council prior to any works commencing on site. No site works shall be permitted until the Plan is approved by Council. The following mechanisms shall be used to control erosion on the site, and to prevent discharge of sediment contaminated runoff to receiving waters: e Where possible, earthworks shall be completed in stages, such that a minimal area of ground is open at any one time. e Perimeter bunds shall be constructed around disturbed areas to divert external catchment flows around these areas. Silt fences shall be used to prevent sediment transport from disturbed areas in close proximity to receiving waters. ¢ Drains shall be protected from scour using regular check dams made from rock rubble. Drains may be lined with turf, rock or sprayed concrete if required. e Sediment traps are to be used in conjunction with drainage lines to collect silt contained in the runoff. ¢ Soil stockpile areas are to be stabilized to prevent erosion. e Embankment slopes shall be stabilized following construction to retain vegetation, moisture and topsoil and promote successful planting. e Where areas are required to remain open for any significant period of time prior to re-vegetation and/or stabilization, the soil surface shall be covered with straw or other suitable material to prevent raindrop splatter. Erosion and water quality control activities on the site shall generally be in accordance with Table C5.1 Comiskey Group 41 18 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.