Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH GC ELEMENT O1 — OPERATIONAL MAINTENANCE OF WSUD ELEMENTS RATIONALE OBJECTIVE / TARGET MANAGEMENT STRATEGY TASKS / ACTIONS FREQUENCY / DEADLINE REPORTING AND REVIEW CORRECTIVE ACTION Servicing and maintenance of the on-site stormwater quality improvement devices is required to ensure the devices perform as required and the stormwater quality discharged from the site meets the identified water quality objectives. To treat stormwater to meet the identified water quality objectives. To implement and maintain the stormwater treatment system at the proposed development. The Building Management shall ensure that all maintenance tasks are completed as required under this Operational EMP. e To inspect and maintain Gross Pollutant Traps. e¢ To inspect and maintain rainwater storage tank Gross Pollutant Traps and Rainwater Storage Tank Maintenance The following monitoring and maintenance tasks will be required to be undertaken. Any accumulated litter including leaves and other debris shall be removed from the filters on an as required basis. The Gross Pollutant Traps should be inspected and cleared after every significant rainfall event and cleaned out on a minimum 3 monthly basis. Implementation is to be ongoing. Reporting to the Building Management upon requirement to complete a CAR and the actions taken in respect of the CAR. Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; Implementation of appropriate mitigation measures as determined by the Building Management; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Building Management shall implement the corrective action(s) as required within the time frame noted on the CAR. Comiskey Group Environmental Management Plan 16 18 June 2008 Rev: 1 238401 Cardno
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.