ENVIRONMENTAL MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

GC

ELEMENT O1 — OPERATIONAL MAINTENANCE OF WSUD ELEMENTS

RATIONALE

OBJECTIVE /
TARGET

MANAGEMENT
STRATEGY

TASKS /
ACTIONS

FREQUENCY /
DEADLINE

REPORTING
AND REVIEW

CORRECTIVE
ACTION

Servicing and maintenance of the on-site stormwater quality improvement
devices is required to ensure the devices perform as required and the
stormwater quality discharged from the site meets the identified water quality
objectives.

To treat stormwater to meet the identified water quality objectives.

To implement and maintain the stormwater treatment system at the proposed
development.

The Building Management shall ensure that all maintenance tasks are
completed as required under this Operational EMP.

e To inspect and maintain Gross Pollutant Traps.
e¢ To inspect and maintain rainwater storage tank

Gross Pollutant Traps and Rainwater Storage Tank Maintenance

The following monitoring and maintenance tasks will be required to be
undertaken.

Any accumulated litter including leaves and other debris shall be removed
from the filters on an as required basis.

The Gross Pollutant Traps should be inspected and cleared after every
significant rainfall event and cleaned out on a minimum 3 monthly basis.

Implementation is to be ongoing.

Reporting to the Building Management upon requirement to complete a CAR
and the actions taken in respect of the CAR.

Should there be non-compliance with the stated performance indicator the
following corrective actions are to be implemented.

e Identification of the cause of the non-compliance;
Implementation of appropriate mitigation measures as determined by
the Building Management; and

e Relevant validation monitoring to confirm that the nominated corrective
actions have been effective.

The Building Management shall implement the corrective action(s) as required
within the time frame noted on the CAR.

 

Comiskey Group

Environmental Management Plan

16 18 June 2008
Rev: 1 238401

Cardno

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.