Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Fertiliser application rates shall be closely monitored to ensure that excess material is not washed off by stormwater runoff and discharged to downstream water bodies. Controlled-release fertilisers shall be used wherever possible. Retardation basins or other sediment capture devices shall be maintained downstream of disturbed areas until re-vegetation is judged to be suitably advanced to limit soil erosion. MONITORING: Monitoring of treated areas to detect the re-emergence of weed species shall be undertaken at intervals of no greater than six months. Any weed species detected shall be treated within appropriate measures to prevent re- establishment and subsequent displacement of native species. Monitoring of rehabilitation works and landscaping works shall be undertaken at monthly intervals to assess the health and vigour of plantings. Any unhealthy plantings shall be treated or replaced. The frequency of monitoring may be progressively reduced as the plantings become established. REPORTING: Monthly reporting by the Contractor to the Superintendent covering all monitoring activities. All reports and records will be provided to Council upon request. CORRECTIVE Non-conformance with this plan shall be documented and a corrective action ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance Register which will be developer and maintained by the Contractor. Copies of CARs shall be provided to Council upon request. The Contractor shall implement the corrective action as required within the agreed time frame noted on the CAR. The Contractor shall advise the Superintendent upon completion of the corrective action. Comiskey Group 15 48 June 2008 Environmental Management Plan Rev: 1 238401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.