Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Fertiliser application rates shall be closely monitored to ensure that excess
material is not washed off by stormwater runoff and discharged to downstream
water bodies. Controlled-release fertilisers shall be used wherever possible.
Retardation basins or other sediment capture devices shall be maintained
downstream of disturbed areas until re-vegetation is judged to be suitably
advanced to limit soil erosion.

MONITORING: Monitoring of treated areas to detect the re-emergence of weed species shall
be undertaken at intervals of no greater than six months. Any weed species
detected shall be treated within appropriate measures to prevent re-
establishment and subsequent displacement of native species.

Monitoring of rehabilitation works and landscaping works shall be undertaken
at monthly intervals to assess the health and vigour of plantings. Any
unhealthy plantings shall be treated or replaced. The frequency of monitoring
may be progressively reduced as the plantings become established.

REPORTING: Monthly reporting by the Contractor to the Superintendent covering all
monitoring activities. All reports and records will be provided to Council upon
request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance

Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 15 48 June 2008
Environmental Management Plan Rev: 1 238401

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.