Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Pavement widening required to achieve lane widths as shown LEGEND: Existing — — — — E/0K — Overhead electricity line Existing kerb and chanenl Edge of bitumen Road centreline \e Proposed connection into existing gully pit Due care to be taken when excavating to avoid damage to ‘existing services Proposed location of drainage line Cutback existing traffic island and construct new kerb line as shown Nominal width of widening 0.25m Refer below for pavement widening detail Relocate existing bus stop sign to suif'new kerb Proposed 12.5m long Busbay Proposed Childcare * Centre Surrounding Wall Nominal kerb line Telstra line : Road widening Gra’ ity main Concrete footpaths Water reticulation main WARNING UNEXPLODED ORDNANCES IN THIS AREA: 152 ppgnsee Pavement widening required width varies nominally 0.8m, refer to Drawing 2384-01-004 for details Reconstruct asphalt pathway to suit proposed kerb levels Proposed intersection upgrade right turn lane to be provided. RESIDUAL UNEXPLODED ORDNANCES MAY EXIST ON THIS SITE EXCAVATION, EARTHWORKS OR SOIL DISTURBANCE RELATED TO THIS DEVELOPMENT SHOULD PROCEED WITH DUE CAUTION IF AN OBJECT SUSPECTED OF BEING AN EXPLOSIVE ORDNANCE OR PART THERE OF IS FOUND TAKE THE FOLLOWING ACTION DO NOT DISTURB THE OBJECT AND TAKE MEASURES TO PREVENT IT BEING DISTURBED BY ANY OTHER PERSON NOTE ITS APPROXIMATE DIMENSIONS AND GENERAL APPEARANCE NOTE THE ROUTE TO ITS LOCATION CONTACT POLICE AS SOON AS POSSIBLE 450 ppgnsie Existing gully pits to be taken up and new pits to be constructed on proposed kerb alignment. 469 ppsisee Driveway crossovers to be constructed and connections made good at all existing driveways. Proposed 2.0m wide concrete pathway Oo i: 2] Existing concrete = block fence O es ae Y, A Assumed existing sewer connection - if not contractor to provide sewer connection to existing manhole Assumed existing water connection - if not Council to provide water meter and connection to main at developer's expense Pavement widening required width =. varies nominally 3.0m, refer to Drawing 2384-01-005 for details Existing lightpole to be relocated to suit new kerb alignment. By others in accordance with Energex requirements 29 ppgnse? Proposed carpark refer to Drawing 2384-01-006 for details Easement over sewer and Zone of influence to be 20 0 20 40 60 80 10.0m confirmed by surveyor 1:200 - Al 1:400 - AZ COMISKEY GROUP SUNSHINE BEACH CHILDCARE CENTRE LOT 31 RP149005 SITE LAYOUT PLAN DRAWING No: 2384-01-003
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.