Pavement widening required
to achieve lane widths as shown

Cutback existing traffic istand and
construct new kerb line as shown

Pavement widening required, width
varies nominally 0.8m, refer to

Reconstruct asphalt
pathway as required to suit

Existing gully pits to be taken up
and new pits to be constructed on

Driveway crossovers to be
constructed and connections made

proposed kerb alignment good at all existing driveways.

Nominal width of widening 0.25m below for details proposed kerb levels
Refer below for pavement widening £ is - : 3 x =
detail

=

 

 

 

 

 

 

 

PACIFIC AVENUE

Proposed intersection upgrade
right turn lane to be provided

; a ee

NORTHERN KERB TT |

NEW KEREUNE : VE i @ fb A v7 ~~ — =. >

a OL

PAVEMENT DESIGN
1 In accordance with Austroads-Pavement Design Manual, 1992, Figure 8.4 DESIGN CHART FOR GRANULAR
PAVEMENTS WITH THIN BITUMINOUS SURFACING" (For flexible pavements less than 10°6) and ARRB SR41

[ type | DESCRIPTION ASSUMED CBR | DESIGNESA | STREET CLASSIFICATION

25mm A.C. Surfacing
145mm compacted base Type 2.2 (min. CBR60)
145mm compacted sub-base Type 2.4 (min. CBR40)

Proposed kerb lip

1.P.54.326, 55.806

LP.79.393, 56.635

Trunk Collector
1.4 x 10° Street

\
\
1.P.71.204, 56.4146

Existing Surface

59.326, 55.986

TYPE B MOUNTABLE KERB
SCALE 1:10

54.326, 55.789

BARRIER KERB AND CHANNEL
SCALE 1:10

> Denotes Nominal Kerb Line

\_ LP.23.790, 54.270
49.326, 55.558

\
38.958, 55.043

BARRIER TYPE KERB AND CHANNEL WIDTH OF WIDENING REQUIRED

25mm DGB30 AC SEAL

 

XISTING ASPHALT SURFACING TO
BE SAW CUT TO PROVIDE OVERLAP
OF NEW ASPHALT SURFACING

33.790, 54.780

3% MIN. XFALL
VERGE

23.790, 54.256

PROVIDE SUBSOIL DRAINS TO KERB:

13.790, 53.705

 

W TYPE C PAVEMENT
ALTERNATIVE - LEAN MIX
CONCRETE DEPTH MIN. 300mm

XISTING PAVEMENT TO
BE CUTBACK TO PROVIDE
CLEAN FACES FOR NEW
PAVEMENT.

VC LENGTH

PAVEMENT WIDENING DETAIL pane

Scale 125-A1 150-A3 a —
Padific Avenue|- Northern tide

 

4.961%

 

 

 

 

 

DATUM R.L.53.0
EASTING

XFALLTO MATCH EXIST

‘XISTING ASPHALT SURFACING TO
BE SAW CUT TO PROVIDE OVERLAP
OF NEW ASPHALT SURFACING

Je

EXIST. TRAFFIC ISLAND

 

NORTHING

MOUNTABLE TYPE B KERB,

=

 

CUT/FILL
(Depth of)

DESIGN LEVELS
KERB LIP

XIST. SURFACE
EVELS

0,000 | 5201.370| 2022.835)
0.015 | 5198.195| 2026.698)
0.141 | 5195.020 | 2030.560}
0.158 |5192.736 | 2033.339
0.159 | 5191.783|2034.368}
0.159 | 5188.386 | 2038.038}
0.144 |5184.990} 204 1.708}
0.108 | 5181594] 2045.377}
0,162 | 5178.198|2049.04 7}
0.167 | 5174.801] 2052.716
0.116 | 5171.405|2056.386
0.157 |5168.009/2060.055
0.158 |5167.342| 2060.777}
0.177 |5164.552 | 2063.66:
0.172 | 5161.081| 2067.267}
0.169 | 5157.610|2070.865}
0.155 | 5154.139|2074 464}
0.072 | 5150.667| 2078.062
-0.005 | 5147.196 | 2081.66
-0,001/5144.498)/2084.458}
-0.000 |$143.727|2085.262|
0.000 | 5143.201] 2085.811

NEW TYPE C PAVEMENT
ALTERNATIVE - LEAN MIX
CONCRETE DEPTH MIN. 300mm

 

!

XISTING PAVEMENT TO
BE CUTBACK TO PROVIDE
CLEAN FACES FOR NEW
PAVEMENT

PAVEMENT WIDENING DETAIL - TRAFFIC ISLAND
Scale ¥25-AT 150-A3

52.926
53.209
53.491
53.694
53.773
54.051
54.321
54.585
55.095
55.343
55.591
55.638
55.817
56.190
56.370
56.516
56.649
56.737
56.762
56.779

 

 

55.004) 54.842

52.926
53.194,
53.632
53.852
53.932
54.209
$4,692
55.748
55.196
55.994
56.525
56.588
56.644
56.735
56.761
56.779

 

 

25.000] 54.465

9.000

5.000
10.000
13.597
15.000
20.000
e000 56.182] 56.010

40.000| 55.262
45.000} 55.459
65.000| 56.359

30.000
35.000
50,000
50.983
55,000
70.000
75.000
80.000
83.886
85.000
85.761

CHAINAGE

 

 

HORIZONTAL

20 0 20 40 60 80 100m 02 0
Ee
1200 - Al 4:400 - AZ

VERTICAL

0.2 04 06 08 10m
=
1:20 - Al 1:60 - AB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NORTHERN KERB
LONGITUDINAL SECTION rPea }O¢Fsicnature: ©, 9-/ Lyw-e~e For Cardno (Qid) Pty Ltd

COMISKEY GROUP

SUNSHINE BEACH CHILDCARE CENTRE
LOT 31 RP149005

 

 

 

 

 

 

 

Carano (Qid) Pty Lid

 

gergeregerg

 

004

 

SUNSHINE COAST OFPCE Love ree! Marcocryaore Oe a8be
Emer scour cwrrecom a Ph (67) S43 2585 Fax (07) $443 S642

 

 

KERB LONGITUDINAL SECTIONS - NORTHERN KERB

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.