08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Pavement widening required to achieve lane widths as shown Cutback existing traffic istand and construct new kerb line as shown Pavement widening required, width varies nominally 0.8m, refer to Reconstruct asphalt pathway as required to suit Existing gully pits to be taken up and new pits to be constructed on Driveway crossovers to be constructed and connections made proposed kerb alignment good at all existing driveways. Nominal width of widening 0.25m below for details proposed kerb levels Refer below for pavement widening £ is - : 3 x = detail = PACIFIC AVENUE Proposed intersection upgrade right turn lane to be provided ; a ee NORTHERN KERB TT | NEW KEREUNE : VE i @ fb A v7 ~~ — =. > a OL PAVEMENT DESIGN 1 In accordance with Austroads-Pavement Design Manual, 1992, Figure 8.4 DESIGN CHART FOR GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING" (For flexible pavements less than 10°6) and ARRB SR41 [ type | DESCRIPTION ASSUMED CBR | DESIGNESA | STREET CLASSIFICATION 25mm A.C. Surfacing 145mm compacted base Type 2.2 (min. CBR60) 145mm compacted sub-base Type 2.4 (min. CBR40) Proposed kerb lip 1.P.54.326, 55.806 LP.79.393, 56.635 Trunk Collector 1.4 x 10° Street \ \ 1.P.71.204, 56.4146 Existing Surface 59.326, 55.986 TYPE B MOUNTABLE KERB SCALE 1:10 54.326, 55.789 BARRIER KERB AND CHANNEL SCALE 1:10 > Denotes Nominal Kerb Line \_ LP.23.790, 54.270 49.326, 55.558 \ 38.958, 55.043 BARRIER TYPE KERB AND CHANNEL WIDTH OF WIDENING REQUIRED 25mm DGB30 AC SEAL XISTING ASPHALT SURFACING TO BE SAW CUT TO PROVIDE OVERLAP OF NEW ASPHALT SURFACING 33.790, 54.780 3% MIN. XFALL VERGE 23.790, 54.256 PROVIDE SUBSOIL DRAINS TO KERB: 13.790, 53.705 W TYPE C PAVEMENT ALTERNATIVE - LEAN MIX CONCRETE DEPTH MIN. 300mm XISTING PAVEMENT TO BE CUTBACK TO PROVIDE CLEAN FACES FOR NEW PAVEMENT. VC LENGTH PAVEMENT WIDENING DETAIL pane Scale 125-A1 150-A3 a — Padific Avenue|- Northern tide 4.961% DATUM R.L.53.0 EASTING XFALLTO MATCH EXIST ‘XISTING ASPHALT SURFACING TO BE SAW CUT TO PROVIDE OVERLAP OF NEW ASPHALT SURFACING Je EXIST. TRAFFIC ISLAND NORTHING MOUNTABLE TYPE B KERB, = CUT/FILL (Depth of) DESIGN LEVELS KERB LIP XIST. SURFACE EVELS 0,000 | 5201.370| 2022.835) 0.015 | 5198.195| 2026.698) 0.141 | 5195.020 | 2030.560} 0.158 |5192.736 | 2033.339 0.159 | 5191.783|2034.368} 0.159 | 5188.386 | 2038.038} 0.144 |5184.990} 204 1.708} 0.108 | 5181594] 2045.377} 0,162 | 5178.198|2049.04 7} 0.167 | 5174.801] 2052.716 0.116 | 5171.405|2056.386 0.157 |5168.009/2060.055 0.158 |5167.342| 2060.777} 0.177 |5164.552 | 2063.66: 0.172 | 5161.081| 2067.267} 0.169 | 5157.610|2070.865} 0.155 | 5154.139|2074 464} 0.072 | 5150.667| 2078.062 -0.005 | 5147.196 | 2081.66 -0,001/5144.498)/2084.458} -0.000 |$143.727|2085.262| 0.000 | 5143.201] 2085.811 NEW TYPE C PAVEMENT ALTERNATIVE - LEAN MIX CONCRETE DEPTH MIN. 300mm ! XISTING PAVEMENT TO BE CUTBACK TO PROVIDE CLEAN FACES FOR NEW PAVEMENT PAVEMENT WIDENING DETAIL - TRAFFIC ISLAND Scale ¥25-AT 150-A3 52.926 53.209 53.491 53.694 53.773 54.051 54.321 54.585 55.095 55.343 55.591 55.638 55.817 56.190 56.370 56.516 56.649 56.737 56.762 56.779 55.004) 54.842 52.926 53.194, 53.632 53.852 53.932 54.209 $4,692 55.748 55.196 55.994 56.525 56.588 56.644 56.735 56.761 56.779 25.000] 54.465 9.000 5.000 10.000 13.597 15.000 20.000 e000 56.182] 56.010 40.000| 55.262 45.000} 55.459 65.000| 56.359 30.000 35.000 50,000 50.983 55,000 70.000 75.000 80.000 83.886 85.000 85.761 CHAINAGE HORIZONTAL 20 0 20 40 60 80 100m 02 0 Ee 1200 - Al 4:400 - AZ VERTICAL 0.2 04 06 08 10m = 1:20 - Al 1:60 - AB NORTHERN KERB LONGITUDINAL SECTION rPea }O¢Fsicnature: ©, 9-/ Lyw-e~e For Cardno (Qid) Pty Ltd COMISKEY GROUP SUNSHINE BEACH CHILDCARE CENTRE LOT 31 RP149005 Carano (Qid) Pty Lid gergeregerg 004 SUNSHINE COAST OFPCE Love ree! Marcocryaore Oe a8be Emer scour cwrrecom a Ph (67) S43 2585 Fax (07) $443 S642 KERB LONGITUDINAL SECTIONS - NORTHERN KERB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.