Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Proposed intersection upgrade right turn lane to be provided Existing kerb entry pit, TRE — ee ee aa eee a \ Pavement widening required width So eee aL 2,75 m | 2 ee af iae erie cornell 3.0m, refer below bus stop sign to OSE pathway refer to ¥ suiting here AY piopexes Busbay) alignment. By others in detail below Existing gum tree l accordance with Energex ~~ to be removed * Y requirements % \ iN | f Existing gum tree to be retained proposed pathway to give minimun of 300mm clearance to trunk bea a SOUTHERN KERB PLAN Proposed kerb lip ALL CONSTRUCTION JOINTS TO BE 30mm SAW-CUT 3m MAX. SPACING OF JOINTS & BROOM FINISH Om WIDE:PALHWAY, tla a hee \\ 1P.60.597, 55.903 75.12k, 56.422 LP.78.224, 56.508 80.724, 56.567 LP.86.312, 56.701 2% MINIMUM CROSSFALL 70.597, 56.246 \\ 1P.42.516, 55.000 60.597, 55.864 100mm MINIMUM COMPACTED GRAVEL SUB-BASE Existing Surface WAY DETAILS SL82 MESH CENTRALLY PLACED Scale 1:20 42516, 55.000 BARRIER TYPE KERB AND CHANNEL WIDTH OF WIDENING REQUIRED ‘25mm 0GB30 AC SEAL XISTING ASPHALT SURFACING TO BE SAW CUT TO PROVIDE OVERLAP OF NEW ASPHALT SURFACING 3% MIN. XFALL VERGE \. LP.12.795, 53.608 ge a m an = © s o a PROVIDE SUBSOIL DRAINS TO KERB: EW TYPE C PAVEMENT ALTERNATIVE - LEAN MIX MISTING PAVERENT TO. ‘ONCRET BE CUTBACK TO PROVIDE CONCRETE DEPTH MIN. 300mm ETB TO ew PAVEMENT VC LENGTH RADIUS PAVEMENT WIDENING DETAIL “Scale 125-A1 150-A3 GRADE 8.587, 53.361 4 6.087, 53.203 < NIA Bin wn ~ DATUM R.L. PAVEMENT DESIGN 1. In accordance with Austroads-Pavement Design Manual, 1992, Figure 8.4 DESIGN CHART FOR GRANULAR EASTING PAVEMENTS WITH THIN BITUMINOUS SURFACING” (For flexible pavements less than 10.6) and ARRB SR41 [ Tyee | DESCRIPTION ASSUMED CBR | DESIGN ESA STREET CLASSIFICATION NORTHING ror ALC. Surfacing Trunk Collector 145mm compacted base Type 2.2 (min. CBR60) Street 145mm compacted sub-base Type 2.4 (min. CBR4O) es ) epth of DESIGN LEVELS KERB LIP XIST. SURFACE EVELS 0.137 | 5135.040] 2075.081| / 0.000 | 5185.346] 2010.89 0.001| 5185.345] 2011.07 -0,003 | 5184636] 2015.82 0.021] 582.407] 2020.27 0.103 | $180.787] 2022.17, 0.123 | 5175.68) 2027.65 0.134 | 5172.29] 2031319 0.167 | 168.849] 2034.96 0.132 | §165.439| 2038.626 0.126 | 5162.029|2042.283 0.143| 5158.619|2065.940 0.163] 5155.210| 2049.59 0.170 | 5154.762| 2050.07 0.155 | 5152.0722053.487 0.150 | 5148.976|2057.613 0.141|5145,879] 2061339 0.134 | 5142.783]2065.265 0.164 | 5139.686| 2069.191| 0.130 | 5136.590| 2073.117 0.137| 5135.119|2074.981| ~0.013 | 5133.39] 2076 904 -0.000| 5129.870| 2079.32 =0.000| 5129.756| 2079.384 | 52.742 52.756 53.127 53.443 53588 53.943 54.178] 54.413 56,667 54.882 55.126 55.314 55.407 55.616 55.839 56.042 56.226 56.397 56.550 o 56.607 56.610 56.669 56.750 56.752 At 52.742 52.757 53.124 53.422 53.691 54.066 56.312 54.579 54.779 55.008 55.267 55.537 55.577 $5.771 55.989 56.183 56.360 56.541 56.680 56.744 56.747 56.656 56.750 56.752 0.000 0.181 5.000 10.000 12.500 20.000 25.000 30,000 35.000 40.000 45.000 50.000 50.657 55.000 60.000] 65.000 70.000 75.000 80.000 82.375 82.502 85.000 89.243 89.370 CHAINAGE HORIZONTAL VERTICAL HC DATA 20 0 20 40 60 80 100m 02 0 02 04 06 08 = De SOUTHERN KERB 1200-A1 1400 - A3 120-A1 40 - AB LONGITUDINAL SECTION Oar Le ela : arn — | “=. | COMISKEY GROUP SUNSHINE BEACH CHILDCARE CENTRE LOT 31 RP149005 KERB LONGITUDINAL SECTION - SOUTHERN KERB Emer sco@avn earérocomm. Ph (G7) Saas 2888
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.